Pre-Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

Cisco 350-601 - Implementing Cisco Data Center Core Technologies (350-601 DCCOR)

Page: 12 / 12
Total 382 questions

An engineer must perform a software upgrade on a production Cisco Nexus 7000 Series Switch. Before the upgrade activity, the requirement is for all ports to be shut down and routing protocols to terminate gracefully. Which feature must be used to meet these requirements?

A.

Configuration Profile

B.

Maintenance Mode Profile

C.

Switch Profile

D.

Service Profile Template

An engineer must analyze packets arriving from a server port on a Cisco Nexus 9000 Series Switch. The packet sniffer is located on a different switch from the one the server is currently connected to. The packet capture must meet these requirements:

    It must capture all incoming packets on the switch port.

    It must capture the first 1000 bytes of the packet to conserve bandwidth.

Which action must be taken to meet these requirements?

A.

Configure the marker-packet to 1000.

B.

Implement an ACL with the packet-length of 1000.

C.

Enable the MTU size of 1000.

D.

Set rate-limiting to 1000.

Which two protocols are used by the NFSv4 protocol? (Choose two.)

A.

FCP

B.

TCP

C.

UDP

D.

Ethernet

E.

IP

Refer to the exhibit.

The Cisco NX-OS scheduler must run every day at 3:00 a.m. Which code snippet completes the script?

A.

time daily 3:00

B.

time start weekly 7 3:00

C.

time start daily 3:00

D.

time weekly 7 3:00