The executive summary of a project management report should emphasize details related to

A.

completed tasks

B.

testing deliverables

C.

risks to the project

D.

stage phase containment status

Which of the following as the most appropriate source of metrics that support the change management decision-making process?

A.

Software library

B.

Software compiler

C.

Status accounting tool

D.

Version control system

Test-driven development in extreme programming ensures the quality of code by

A.

defining test pass criteria before code is written

B.

defining what code modules will be tested

C.

having the testers determine the order in which code should be written

D.

having the code tested before the product is released

When a defect is discovered during the test phase., what is the earliest phase in the software lifecycle that could need rework to resolve the defect?

A.

Implementation

B.

test

C.

requirements

D.

design

Globalization requirements involve

A.

defining the required information flow across shared interfaces to external entities

B.

defining problems to be solved or opportunities to be addressed by the software product

C.

looking at the capability of the software product from the perspectives of various stakeholders

D.

developing software that can be adapted to target markets and customizing software for those markets

Which of the following problem-solving tools is most appropriate for breaking down ideas into progressively greater detail?

A.

Tree diagram

B.

Matrix diagram

C.

Affinity diagram

D.

Relationship diagram

Which of the following elements must be in place for a measure to be reliable?

A.

A well-designed data collection form

B.

An automated tool for calculating the measure

C.

An operational definition of the measure

D.

An online database for tracking the measure

The tester should complete which of the following sections of a problem report when documenting a test failure?

A.

Steps to reproduce the failure

B.

Steps to recover from the failure

C.

Root cause of the problem

D.

Problem resolution description

Which of the following documents must be under configuration control?

A.

Problem issues

B.

Control chains

C.

Test procedures

D.

Burn charts

To increase the likelihood of the success of a software project, the project plan should meet which of the following requirements?

A.

It should be completed before the project activities begin.

B.

It should be reviewed and updated at each phase of the project.

C.

It should be developed by an independent software developer

D.

It should be approved by the steering committee.