Test data requirements

A.

include mechanisms for defining when, and for how long, each test data item is needed

B.

allow test data items to be reusable so that the same tests can be executed multiple times

C.

describe the data items and their characteristics and properties needed to execute the tests

D.

act as a single source of content for multiple testers to find and use existing test data items

Which of the following organizational benefits is associated with increased satisfaction among external stakeholders?

A.

Improved predictability of costs

B.

Increased productivity of practitioners

C.

Strengthened ability to survive or prosper

D.

Reduced development and maintenance costs

The following graphs illustrate the arrival rate and current status of software defects during system test. Which of these graphs indicates a product that is most ready for formal release to the customer?

A)

B)

C)

D)

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Regression testing can often be automated because this level of testing is performed

A.

late in the lifecycle when program structure documentation is available

B.

to assess coverage of all paths through the system

C.

many times with few changes

D.

at the end of product development when all system functionality is available

After test procedures have been executed and problems have been identified, the next step should be to

A.

begin updating the test cases and perform a retest

B.

release the product to the customer

C.

implement appropriate changes to the code

D.

develop plans to resolve the issues reported

Which of the following charts is designed to monitor variation over time in a process?

A.

Gantt

B.

Pareto

C.

Run

D.

Radar

One of the requirements in a software quality plan is to measure the average time software performs without a problem in a production environment during regular business hours under usual workload. This is an example of which of the following quality* attributes?

A.

Timeliness

B.

Availability

C.

Performance

D.

Reliability

Test-driven development in extreme programming ensures the quality of code by

A.

defining test pass criteria before code is written

B.

defining what code modules will be tested

C.

having the testers determine the order in which code should be written

D.

having the code tested before the product is released

When modifications are made to a software system, which of the following tools is helpful for determining appropriate verification and validation tasks?

A.

Affinity diagram

B.

Pareto chart

C.

Cause and effect diagram

D.

Requirements traceability matrix

Which of the following methodologies is most appropriate for managing test data?

A.

Establishing separate cases for each level

B.

Creating a central repository for data items

C.

Using data items from the operational environment

D.

Identifying data items that have become defective over time