AVIXA CTS-D - Certified Technology Specialist – Design

Page: 2 / 5
Total 150 questions

What is the primary advantage of using PoE (Power over Ethernet) in AV system design?

A.

It increases video resolution

B.

It eliminates the need for separate power cables to devices

C.

It guarantees better signal quality

D.

It simplifies audio mixing

Which of the following best describes a “needs analysis” in AV system design?

A.

Determining the technical specifications for equipment

B.

Gathering and understanding client requirements and project goals

C.

Developing a budget estimate

D.

Writing the installation manual

Which of the following best describes “latency” in AV signal processing?

A.

The delay between input and output of a signal

B.

The signal strength

C.

The cable length

D.

The power consumption

What is the key characteristic of a cardioid microphone pattern?

A.

Picks up sound equally from all directions

B.

Picks up sound primarily from the front and rejects from the back

C.

Picks up sound only from the rear

D.

Omnidirectional

What is “plenum-rated” cable used for in AV installations?

A.

Outdoor wiring

B.

In spaces used for air circulation with fire-resistant properties

C.

Temporary setups

D.

High-voltage applications

Which AV industry organization administers the CTS-D certification?

A.

AVIXA

B.

IEEE

C.

ANSI

D.

OSHA

Which type of cable connector is typically used for balanced audio?

A.

RCA

B.

XLR

C.

HDMI

D.

USB

What is “PoE” in AV system design?

A.

Power over Ethernet, supplying power and data over a single cable

B.

Protocol over Ethernet

C.

Power only Ethernet

D.

Professional output equipment

What type of microphone is most effective at rejecting background noise?

A.

Omnidirectional

B.

Cardioid

C.

Lavalier

D.

Boundary

What is the role of “project management” in AV system design?

A.

Purchasing equipment

B.

Planning, organizing, and managing resources to complete the project on time and within budget

C.

Installing cables

D.

Training end users