Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

SAVE International CVS - Certified Value Specialist

Page: 3 / 5
Total 147 questions

SMART stands for

A.

Specific, Measureable, Attainable, Reasonable, and Timebound.

B.

Specific, Measureable, Accountable, Relevant, and Timebound.

C.

Standards, Measureable, Attainable, Relevant, and Timebound.

D.

Standards, Measureable, Accountable, Relevant, and Timebound.

E.

Standards, Measureable, Attainable, Reasonable, and Timebound.

F.

Specific, Measureable, Attainable, Relevant, and Timebound.

A company wants to add a new product to its manufacturing process. Who should provide input as this new product will affect the current manufacturing process?

Choose 3 answers.

A.

Marketing

B.

Maintenance

C.

Production

D.

Human resources

E.

Engineering

Which of the following strategies should be employed to enhance the VM study presentation?

Choose 2 answers.

A.

Include a summary of key points to reinforce the message.

B.

Design the presentation in a complex format.

C.

Utilize visuals such as charts and graphs.

D.

Provide handouts with detailed technical specifications.

The VM Job Plan differs from the scientific method approach to problem-solving because the VM job plan

A.

requires less information on a subject than the scientific method.

B.

focuses on what a subject does.

C.

requires less analysis than the scientific method.

D.

analyzes a problem and develops a hypothesis.

Select the best matches for the functions of prescription eyeglasses.

A team wants to skip Function Analysis because the design solution already appears obvious. What is the best CVS-level response?

A.

Agree, because Function Analysis is optional when experts are present

B.

Skip directly to Development to save time

C.

Perform Function Analysis because it is essential to a valid VM study

D.

Replace Function Analysis with procurement benchmarking only

What is the role of the client in the Information Phase?

A.

Describe the project

B.

Define expectations

C.

Explain the process

D.

Define the agenda

During the Implementation Phase, the project manager is tasked to ensure compliance with internal tracking and auditing procedures. Which action would most effectively demonstrate the application of tracking and audit knowledge and skills?

A.

Develop a training manual for new employees on how to use the project management system, but do not include tracking procedures.

B.

Implement a weekly status update meeting where project milestones are discussed, but focus solely on outcomes without auditing the processes used.

C.

Conduct regular audits of project documents to confirm all data entries are accurate and compliant with company standards.

D.

Only review audit logs at the end of the project to assess compliance and make necessary adjustments for future projects.

Which of the following strategies should be used to enhance understanding of VM proposals presented during the Presentation Phase?

Choose 2 answers.

A.

Rely solely on the graphics without verbal explanations.

B.

Include as many graphics as possible to showcase creativity.

C.

Use baseline and proposed graphics at a similar level of complexity.

D.

Provide clear explanations and context for each graphic presented.

Which of the following should be considered when preparing the VM study report?

Choose 3 answers.

A.

Identifying non-study focus groups

B.

Status of the VM study subject

C.

Using technical language

D.

Focusing on the typical audience of stakeholders and project managers

E.

Creating a document for those not involved in the VM study