Total 80 questions

In which module do you process profit center allocations in SAP S/4HANA?

A.

Account-based profitability analysis

B.

General ledger accounting

C.

Product cost accounting

D.

Cost center accounting

You want to enable WIP calculation in Product Cost by Period. What do you need to configure?

A.

Variance variant

B.

Settlement profile

C.

Profitability Analysis (PA) transfer structure

D.

Valuation variant

Which of the following statements best describe Product Cost by Order?

Note: There are 2 correct answers to this question.

A.

It is recommended for products with a long production time.

B.

It is used when full cost traceability is needed.

C.

It is used when controlling by individual production lots or discrete quantities is needed.

D.

It is used when you perform repetitive manufacturing.

In the Product Cost by Order process, what does the system calculate depending on the order status?

A.

WIP at target costs or variances

B.

Both WIP and variances or only variances

C.

WIP at actual costs or variances

D.

WIP at percentage of completion (PoC) method or variances

How would you explain automatic account assignment in SAP S/4HANA?

Note: There are 2 correct answers to this question.

A.

It can be defined for postings on general ledger accounts of primary costs type.

B.

It can be defined for postings on general ledger accounts of secondary costs type.

C.

Proposed values can be overwritten in the application.

D.

Proposed values take precedence over validation and substitution.

What can you configure in the settlement profile?

Note: There are 2 correct answers to this question.

A.

Determine whether settlement is required.

B.

Determine an overhead key.

C.

Define a number range for settlement documents.

D.

Define settlement document type.

You are considering using commitment management with internal orders. Where do you need to activate commitment management?

Note: There are 2 correct answers to this question.

A.

In the order type

B.

In the controlling area

C.

In individual internal order master data

D.

In the version

You want to use budget availability control for your projects and internal orders. What can you check using budget availability control?

Note: There are 2 correct answers to this question.

A.

The availability of funds in object currency

B.

The availability of funds on a period level

C.

The availability of funds using overall plan value

D.

The availability of funds according to tolerance limits

Which of the following values can be calculated using results analysis?

Note: There are 3 correct answers to this question.

A.

Gross margin

B.

Reserves for unrealized costs

C.

Work in progress

D.

Cost of goods manufactured

E.

Cost of sales

You have implemented Product Cost by Sales Order in conjunction with cost-based POC results analysis in your organization. For a particular sales order item, you have the following:

Plan revenue = 3000, Plan costs = 2000, Actual revenue = 1200, Actual costs = 1000.

What data does the system calculate during results analysis?

A.

Revenue = 1200; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 200

B.

Revenue = 1200; Cost of sales = 1000; Revenue surplus = 200

C.

Revenue = 1500; Cost of sales = 1000; Revenue surplus = 300

D.

Revenue = 1500; Cost of sales = 1000; Capitalized revenue (revenue in excess of billings) = 300