Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

SAP E_S4HCON2023 - SAP Certified Technology Specialist - SAP S/4HANA Conversion and SAP System Upgrade

Page: 2 / 3
Total 80 questions

What is the minimum SAP_BASIS release of an SAP ECC system that can be converted to an SAP S/4HANA Server?

A.

750

B.

700

C.

731

D.

740

Which are valid options to check the progress of the database migration in a Microsoft Windows environment?

There is correct answers to this question.

Response:

A.

Check the "Charts Control Center" in the SUM UI

B.

Check logs for jobs starting with "RSUPG_SGEN" in the system

C.

Check the log files written under "SUM\abap\log"

D.

Check the dump size of the database export on disk

You are performing an upgrade of an SAP ECC development system with SUM. What is the earliest point when the upgrade is considered complete and you can allow all dialog users to log on to the system?

Please choose the correct answer.

Response:

A.

After the SUM roadmap step "Execution" is finished and before "Postprocessing"

B.

During the SUM roadmap step "Postprocessing", after the post procedure steps are complete

C.

During the SUM roadmap step "Postprocessing", in parallel with post procedure steps

D.

After the SUM roadmap step "Postprocessing" and post procedure steps are finished

You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime.

The server provides 8 CPU cores. Phase EU_CLONE_MIG_DT_RUN is running. In the Charts Control Center you can see 40 Process Buckets being executed in parallel.

Why are 40 Process Buckets executed in parallel?

Please choose the correct answer.

Response:

A.

There is a maximum of 40 parallel R31oad processes within this specific downtime phase.

B.

SUM is still running in uptime; the number of 40 defined R31oad processes is considered.

C.

The number of CPU cores does not allow more than 40 R31oad processes to be run in parallel.

D.

These are 40 pairs of R3load processes, so there are 80 R3load processes running.

During the configuration of the DMO for SUM, how does the tool behave if option "Do not compare table contents" is selected regarding table comparison?

Please choose the correct answer.

Response:

A.

It performs a comparison on selected tables using check sum.

B.

It performs a comparison on all tables using row counts.

C.

It performs a comparison of all tables using check sum.

D.

It does NOT perform any table comparison.

During an SAP S/4HANA conversion with DMO, which of the following actions take place during the business downtime of the SUM procedure?

There are 3 correct answers to this question.

Response:

A.

Execution of SPAU modification adjustment

B.

Execution of eCATTs for business validation tests

C.

Creation of the table structures in the new SAP HANA database

D.

Execution of SPDD modification adjustment

E.

Execution of XPRAs and AIMs

You are running an SAP ECC system with SAP_BASIS 740, non-Unicode on SAP MaxDB. Which of the following are possible paths to perform an SAP S/4HANA conversion? Note: There are 3 correct answers to this question.

A.

Unicode conversion Upgrade to SAP ECC with SAP_BASIS 750 including database migrationSAP S/4HANA conversion without database migration

B.

Unicode conversion SAP S/4HANA conversion including database migration

C.

Unicode conversion SAP S/4HANA conversion without database migration Database migration

D.

SAP S/4HANA conversion including database migration and Unicode conversion

E.

Unicode conversion Database migration SAP S/4HANA conversion without database migration

You downloaded content from the SAP note 1000009 ("ASU Toolbox 2008"). Which transaction needs to be executed to use that content in the ASU Toolbox?

Please choose the correct answer.

Response:

A.

/ASU/UPGRADE (Start ASU Toolbox in Upgrade Mode)

B.

/ASU/SSM (ASU Simple Schedule Manager)

C.

/ASU/SHOW_NOTE (Show SAP Note via Web-Browser)

D.

/ASU/START (Start ASU Toolbox)

Which downtime optimization technique requires the minimized downtime service (MDS) from SAP?

A.

Downtime Optimized DMO (DoDMO)

B.

Near-Zero Downtime Maintenance (nZDM)

C.

Near-Zero Downtime Technology (NZDT)

D.

Downtime Optimized Data Conversion (DoC)

In which scenarios do you need to use SUM 2.0 instead of SUM 1.0?

There are 2 correct answers to this question.

Response:

A.

Upgrading to SAP ECC 6.08 without using DMO

B.

Using DMO when applying Support Packages to SAP ECC 6.07

C.

SAP S/4HANA conversion to SAP S/4HANA 1709

D.

Updating to SAP ECC 6.07 using DMO