Pure Storage FlashArray-Implementation-Specialist - Pure Certified FlashArray Implementation Specialist (FAIS) Exam
Total 234 questions
Which PCIe slot must be used for a SAS HBA on R4B revision controllers?
An Implementation Engineer is onsite to replace a 22TB data pack with a new 91TB (10 x 9.1TB) data pack in a FlashArray//X90R5 Gen 2. The array is at 90% capacity. It currently has 22TB (10 x 2.2TB) in slots 0-9 and 63TB (14 x 4.5TB) in slots 10-23, configured as two separate write groups.
What is a supported method to proceed with the planned capacity migration?
Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?
After running puredb run giveback --safe command once CT0 has been upgraded, how long should the Implementation Engineer wait before continuing with the controller upgrade?
An Implementation Engineer has completed cabling a DirectFlash Shelf (DFS) to the FlashArray.
Which command should the Implementation Engineer run to verify that the cabling was completed correctly?
During the puresetup portion of the new controller setup of an NDU, the Implementation Engineer gets the error message shown in the exhibit. What action should the Implementation Engineer take next?
On FlashArray models that use standard DFMs instead of DFMDs, which NVRAM bays are always populated?
At the completion of an upgrade, what command should the Implementation Engineer run to send phonehome logs?
The Pure Engagement Request (PER) specifies that iSCSI ports ETH2 and ETH3 should be set to 10 Gb/s. After configuring the ports and connecting them to the SAN, the Implementation Engineer observes that ETH2/3 are not negotiating and display 0 b/s. The SAN is operating at 40 Gb/s, with support for up to 100 Gb/s.
What should the Implementation Engineer do to resolve this issue and complete the install?
Which user does an Implementation Engineer use when preparing for the Purity upgrade to complete a HWNDU?