Huawei H19-321 - Huawei Certified Pre-sales Specialist - Service Solution

Page: 7 / 8
Total 265 questions

data center L1 integration interface content includes (multiple choice)

A.

Power supply and distribution system, lightning protection grounding

B.

Cabinet, machine room management, integrated wiring

C.

HVAC water supply and drainage system

D.

Machine room decoration, fire protection system

Insufficient daily wireless optimization capabilities, prominent coverage, interference, switching problems, indicators that do not meet standards and other scenarios have excellent opportunities for existing wireless networks.

A.

True

B.

False

Disaster recovery consulting and planning services include information collection, analysis, strategy formulation and other services for the business environment.

A.

True

B.

False

Which of the following is not HCIE's recognition of the student's ability?

A.

Way of thinking

B.

Theoretical knowledge

C.

Hands-on ability

D.

Comprehensive quality

Huawei's career certification system is based on years of experience in ict talent training and understanding of industry development, based on the ict industry chain talent personal career development cycle, with levels of vocational and technical certification IP, IT, CT and ICT fusion technology certification system; the only ICT all-technology certification system.

A.

True

B.

False

Data center L1 layer business deepening design goal (multiple choice)

A.

On the basis of the summary audit plan (bidding plan), the needs of the owner are further clarified, and the boQ at the design plan level is refined, and the design depth reaches the construction drawing standard

B.

Improve the design interface interface to ensure that the design of the respective systems of the project is consistent and coordinated with the professional design of architecture, structure, water, electricity, HVAC, decoration and other professions

C.

Provide technical basis for the bidding of installation units (subcontracted construction units), equipment suppliers and project acceptance

D.

Combined with the actual situation of the project, the work responsibility interface of Huawei (including tripartite purchased parts), subcontractors, and customers is determined, and the project purpose SOW (scope of work) and support determination RM (Responsibility)

Which of the following components are used by FusionACCess to publish application virtualization?

A.

HDC

B.

APS

C.

FROM

D.

WI

a project request for proposals to provide on-site service, 7 * 4 spare parts response, every six months 1 inspection service, we can sell what level of maintenance services to match customer needs? (Multiple choice)

A.

Standard+

B.

Silver+

C.

Gold+

D.

gold medal

The scope of work of the engineer's on-site service includes (multiple choice)

A.

Weekly/monthly report on daily fault handling and operation

B.

Problem tracking and upgrading and troubleshooting with Huawei TAC

C.

Routine inspections and reports

D.

Service customization and network optimization services

E.

Equipment relocation services

Which products below gold + maintenance services contain inspection services () (multiple choices)

A.

NE Router

B.

CE switch

C.

Transmission, access

D.

storage

E.

server

F.

Wireless & Core