Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

Huawei H35-460 - HCS-5G RAN V1.0

Page: 6 / 7
Total 218 questions

The transmitted data in the initial data configuration of gNodeB has a strong coupling relationship with the wireless data.

A.

True

B.

False

Which of the following modules supports 64T64R?

A.

AAU5613

B.

AAU5612

C.

RRU3939

D.

AAU5616

gNodeB The order in which hardware devices are added is "cabinet->chassis-> single board->RF unit".

A.

True

B.

False

gNodeB configures the "Rewind Primary Path Flag" parameter in the SCTP template to indicate whether to switch back to the primary path when it can be used after the established SCIP primary path fails.

A.

True

B.

False

After the 5G network UE is powered on and enters the idle state, what operations will be performed in the Attach process? (Multiple Choice)

A.

Establish the same mobility context between UE and corenet

B.

Through the EPS ATTACH process, UE can also obtain network-assigned IP addresses

C.

Establish default hosting between UE and the core network

D.

Listen on the network to get downstream synchronization

5G RAN 2.0 version gNodeB logical cells and sector devices use the command ANDD NRDUCELLTRP to complete the binding.

A.

True

B.

False

When debugging the NR base station through the near end of the USB flash drive, which of the following conditions will cause the RU indicator of the main control board to be in the "load failed" state?

A.

The data profile loaded by the network element through the USB flash drive last time is consistent with the data profile in the USB flash drive

B.

The base station recognizes that the base station corresponding to the USB flash drive is not the current base station

C.

The data in the USB flash drive is not protected by integrity protection and encryption

D.

The file format or self-recording in the USB flash drive is illegal

In the Sub 3G band, the maximum beam number of SSBs in the NR is 16.

A.

True

B.

False

In order to obtain a high upstream rate, the transmit power of the CPE needs to be set to the maximum power of the generator

A.

Correct

B.

Errors

In the 5G RAN version 2.1, what is the maximum number of 100MHz 64*64 NR cells supported by a single BBU5900?

A.

6

B.

18

C.

9

D.

3