CIPS L4M2 - Defining Business Needs

Page: 2 / 9
Total 303 questions

Which of the following is an environmental criterion that can be included when drafting a specification for new machinery?

A.

The brand name of the preferred machinery

B.

The emissions produced by the equipment

C.

The location of the manufacturing plant

D.

The home country of the supplier

Which of the following is an assumption of Kano model?

A.

The relationship between product functionality and customer satisfaction is always linear

B.

Different types of customer requirements have different impact on customer satisfaction

C.

All types of customer requirements have the same impact on customer satisfaction

D.

All customer requirements are basic requirements

Sealines Inc is developing its fleet of cargo ships. The company is planning to build a new ship powered by natural gas. Brian, the procurement manager at Sealines, suggests the project team to develop a through-life specification before engaging with the supplier. Is this a correct approach?

A.

Yes, decommissioning and disposal costs will not be accounted in this approach

B.

Yes, this approach will lower the total cost of ownership

C.

No, a ship is used only once, through-life management is unnecessary

D.

No, the company just needs to select the lowest bidder

A company is planning the procurement of an IT system and wants to agree a through-life contract with the supplier to ensure ongoing system support. The first step in producing that specification should be to:

A.

Build a design

B.

Prepare tendering documents

C.

Identify the IT system supplier

D.

Define the user requirements

Gaskins Caskets (GC) is a manufacturing company that wants to identify new suppliers for a number of current parts. GC no longer has technical drawings for the parts and none of the engineers currently working for them have enough knowledge of the parts to write a specification. What could GC do to get accurate pricing from suppliers for these parts to compare to the existing parts?

A.

GC's engineers could estimate the specification and drawings that are sent to prospective suppliers

B.

GC could send samples of the parts to prospective suppliers as part of the request for quotation

C.

GC could communicate a cost to the suppliers that must be met regardless of the final specification

D.

GC could allow suppliers to develop and use their own specification as part of their cost proposal

At which stage of product life cycle, price competition between sellers will be the most intense?

A.

Growth stage

B.

Introductory stage

C.

Maturity stage

D.

Decline stage

An IT department has tasked procurement to help produce a conformance specification for new company laptops. Which factor is common within a conformance specification?

A.

Meets the operational requirements

B.

Tends to be short and specific

C.

Allows flexibility in the offering

D.

Meets the specification standard

A company is considering buying a new computer system to handle large amounts of personal data and expects the system to perform in a particular way. Which of the following should be included in the performance specification? Select TWO that apply.

System operating conditions

A.

List of outputs

B.

Brand name

C.

List of inputs

D.

Technical drawings

When a procurement manager considers a substitution, the number and nature of additional func-tions that substitute provides should be taken into account carefully. Which of the following ratio could help the procurement manager to make the right decision?

A.

Value to price ratio

B.

Price to Earnings ratio

C.

Reserve requirement ratio

D.

Price to book value ratio

Which of the following bodies provides standards for the products and services in the US?

A.

ISO

B.

ANSI

C.

AFNOR

D.

BSI