Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Alkalinity testing, drift eliminators and energy star rating

B.

Makeup water meters, conductivity controllers and overflow alarms

C.

Non potable water sources, makeup water meters and bacteria testing

D.

Water treatment calculations, overflow alarms and system performance narrative

A tenant with 1,000 employees wishes to pursue LEED Interior Design and Construction Certification for their space in which they will be the sole tenant. Which of the following building attributes will help the tenant achieve points in the Location and Transportation category?

A.

A car sharing program

B.

60 bike racks and seven shower/changing rooms

C.

Electric car charging stations in the parking garage

D.

A bus line with 30 daily rides with a bus stop within 1/2 mi. (0.80 km) of the building entrance

During value engineering a project team is looking to see if they can reduce the number of thermal comfort controls. The project's LEED AP notices there are thermostats in the public restroom and says they can be eliminated because public restrooms are considered

A.

unoccupied space

B.

densely occupied space

C.

shared multioccupant space

D.

nonregularly occupied space

Which of the following statements is correct when defining the project boundary?

A.

The project boundary must be defined by the limit of construction

B.

The LEED project boundary cannot include more than one building

C.

The gross floor area of the LEED project should be no less than 1,000 ft2 (93 m2)

D.

Contiguous land that is associated with the project that is altered as a result of construction must be included

A tenant is soliciting proposals for a Commissioning (Cx) agent for Energy and Atmosphere Credit, Enhanced Commissioning. Which qualification must the agent meet?

A.

Subcontractor of construction manager

B.

Not an employee of the project design firm

C.

Member of the Building Cx Association

D.

Commissioning Authority (CxA) with experience in at least one prior project

A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.

Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?

A.

Water-Related Systems

B.

Energy-Related Systems

C.

Indoor Air Quality Systems

D.

Waste Management Systems

Which of the following phases should be included in the Integrative Process Credit, Integrative Process in order to comply with the intent of this credit?

A.

Discovery; design and construction; occupancy; operations and feedback

B.

Discovery and design; construction and occupancy; post occupancy and operations

C.

Pre-design and design; construction and occupancy; post occupancy and operations

D.

Pre-design and design; construction and pre-occupancy; post occupancy and operations

A project owner is seeking Location & Transportation Credit, Surrounding Density and Diverse Uses for an office that is being relocated. In order to promote walkability and reduce the distance driven by employees, which of the following solutions should the project owner consider?

A.

An employee transportation management plan

B.

A location that has retail shops within the same building

C.

An employee survey measuring occupant usage of public transit

D.

A location that is within 1/2 mi. (0.80 km) of four different basic services

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Commercial dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Commercial clothes washers and coffee makers

A luxury hotel project is one point away from attaining LEED Platinum certification. The LEED AP is recommending that the team pursue Innovation Credit, Innovation, Option 3. Additional Strategies. Which of the following credits would be applicable?

A.

Regional Priority Credit, Optimize Energy Performance

B.

Indoor Environmental Quality Credit, Quality Views, Exemplary Performance

C.

Indoor Environmental Quality Credit, Acoustic Performance, Exemplary Performance

D.

Energy and Atmosphere Credit, Enhanced Commissioning, Exemplary Performance