Which of the following facilitates the recharging of aquifers?

A.

Asphalt road

B.

Pervious paving

C.

Impervious paving

D.

Concrete parking lot

Which of the following strategies, when designed together, can save energy and improve occupant experience?

A.

Daylighting and natural ventilation

B.

Thermal comfort and water meters

C.

Energy metering and thermal comfort

D.

Ventilation and carbon monoxide monitoring

The water use reduction for a project is determined by finding the difference between the baseline conditions and the

A.

local water usage rate

B.

project occupancy type

C.

calculated installed case

D.

permitted maximum water usage

Integrated Project Planning and Design is a prerequisite for which type of buildings?

A.

Retail

B.

Schools

C.

Healthcare

D.

Data Centers

An owner is looking to update the interior materials of the office while promoting a healthier indoor work environment using LEED strategies. During the materials specification, which of the following strategies can the owner take in order to achieve this goal?

A.

Specify salvaged materials

B.

Specify low-cost materials

C.

Specify low-emitting materials

D.

Specify high solar reflectance materials

The maximum number of credits that can be achieved under Energy and Atmosphere category for Building Design and Construction: New Construction and Major Renovation is

A.

30

B.

31

C.

33

D.

35

What is the approximate percentage of global carbon dioxide emission related to transportation?

A.

28%

B.

13%

C.

4%

D.

33%

Which of the following accurately describes CIRs (Credit Interpretation Requests)?

A.

CIRs allow project teams to obtain technical guidance for a particular credit in the LEED rating system

B.

Any approved CIR can be used for any LEED project

C.

Use of CIRs is limited to LEED projects

D.

USGBC members and registered LEED project team members may approve CIRs

Which of the following plans is implemented after occupancy?

A.

Value Engineering

B.

Stormwater Pollution Prevention

C.

Green Cleaning

D.

Fundamental Commissioning (Cx)

Which of the following techniques IS recommended for preventing the negative effects of indoor pollutants?

A.

Deep cleaning all surfaces during occupant move-in

B.

Keeping material containers open during construction

C.

Specifying and installing low-emitting materials at the source

D.

Keeping doors and windows open after installation of interior finishes