What standard addresses Indoor Environmental Quality?

A.

ASHRAE 90.1

B.

ASHRAE 62.1

C.

Energy Policy Act of 1992 (EPAct of 1992)

D.

The Montreal Protocol

A city is experiencing significant congestion in its downtown core due to excessive reliance on single-occupancy vehicles. The municipal government decides to implement a Transportation Demand Management (TDM) plan to alleviate traffic congestion and reduce vehicle miles traveled (VMT). Which of the following strategies could be included in the city’s TDM plan to effectively reduce VMT?

A.

Add more highway lanes to reduce traffic

B.

Limit the number of parking spots in the downtown area

C.

Subsidize electric vehicle purchases for residents

D.

Increase minimum parking requirements for all buildings

The range of points required to maintain Gold level of LEED certification is

A.

40-49

B.

50-59

C.

50-69

D.

60-79

The Increase in air temperature in a developed area resulting from the dark surfaces of roadways, parking lots, and tarred rooftops is known as

A.

emissivity

B.

global warming

C.

greenhouse gas

D.

heat island effect

At which phase should a project team begin the commissioning process?

A.

At the start of construction

B.

During permitting

C.

After the building is operational

D.

Early in the design

Which of the following is a minimum program requirement for LEED@ for New Construction and Major Renovations projects?

A.

Be a permanent building or space on existing land

B.

Commit to sharing data for water usage only

C.

Comply with maximum floor area requirements

D.

Comply with maximum ventilation rate requirements

Which is an example of regenerative design?

A.

Passive house energy building

B.

A building with a recycling program

C.

A project that uses sustainable materials

D.

A building that generates electricity and sends the excess to the grid

The Interior space of a six-story commercial building is being completely renovated. Which of the following actions should the design team conduct first in order to incorporate green building strategies?

A.

Set project goals

B.

Identify improvement opportunities

C.

Benchmark performance of existing building

D.

Measure performance and undergo third party verification

A landscape architect, a civil engineer, and a city planner collaborate to reduce stormwater runoff at a new building. This collaboration is an example of what strategy?

A.

Integrative process

B.

Siloed design

C.

Rainwater management

D.

Life-cycle approach

A project team is considering the redevelopment of a site that was previously used for coal manufacturing and mining. The site is open for cleaning and adaptive use. The team aims to address potential environmental concerns while leveraging the location for new development opportunities. What initial step should the project team take when considering the redevelopment potential of a former industrial site?

A.

Perform an initial survey of site ecology to document habitats or species that may influence redevelopment decisions

B.

Investigate historic site use to determine preservation opportunities

C.

Conduct a Phase I Environmental Site Assessment to identify potential contamination

D.

Begin construction immediately because the site is previously developed