Spring Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

Microsoft MB-330 - Microsoft Dynamics 365 Supply Chain Management

Page: 3 / 7
Total 405 questions

You need to determine Operator1s next steps.

Which next two process steps should Operator1 complete? To answer, move the appropriate processes to the correct process steps. You may use each process once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

You need to determine the number of pickle bottles in each case. What should you configure?

A.

Unit sequence group

B.

Unit of measure conversation per product

C.

Unit of measure conversion per product variant

D.

Operating units

You need to configure the requirements for VendorC.

What should you configure? To answer, move the appropriate features to the correct requirement types. You may use each feature once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

You need to resolve Operator's label issue.

Which solutions will achieve the resolution of the labels? To answer, select the appropriate options in the answer area.

NOTE; Each correct selection is worth one point.

You need to configure the kosher pickle requirements for VendorA.

What should you configure? To answer, move the appropriate configurations to the correct requirements. You may use each configuration once, more than once, or not at all. You may need to drag the split bar between panes or scroll to view content.

NOTE: Each correct selection is worth one point.

You need to meet the requirements for CustomerD.

Which two parameters should you configure? Each answer presents part of the solution.

NOTE: Each correct selection is worth one point.

A.

Reservation hierarchy

B.

Sellable days

C.

FEFO date-control led

D.

Wave templates

E.

FIFO with include physical value

A company uses Dynamics 365 Supply Chain Management.

Sales of an item doubles during the holiday season. You plan to revise the minimum coverage proposal of the item.

You need to update the item's new minimum quantity in safety stock journal lines.

What are two possible ways to achieve this goal? Each correct answer presents a complete solution.

NOTE: Each correct selection is worth one point.

A.

Update the Multiplication factor field. Calculate the minimum proposal for the inventory level.

B.

Update the New minimum quantity value to match the value in the Calculated minimum quantity field.

C.

Select the Service level. Calculate the minimum proposal for the inventory level.

D.

Select the Use the calculated minimum quantity as the new minimum quantity parameter option. Calculate the minimum proposal for the inventory level.

You need to resolve the mango preserve issue and minimize the number of location directives.

What should you configure?

A.

Customer product filter

B.

Item group setup product filter

C.

Released product setup product filter

D.

Warehouse management setup product filter

A company uses Dynamics 365 Supply Chain Management. The company plans to implement master planning.

You need to configure the master planning solution to perform master planning runs in the middle of each day instead of at the end of each day.

Which solution component should you use? To answer, select the appropriate options in the answer area.

NOTE: Each correct selection is worth one point.

A company uses the built-in master planning engine but plans to use Planning Optimization instead. You enable auto-firming. You need to ensure that planned orders are firmed within the current month. What should you do?

A.

Set the firming time fence to one month plus issue margin.

B.

Set the firming time fence to one month plus receipt margin

C.

Set the firming time fence to one month plus lead lime rf the while is greater than one week.

D.

Set the firming time fence to one month

E.

Set the firming time fence to one week plus lead time if the lead time is less than one week.