Nutanix NCP-5.10 - Nutanix Certified Professional (NCP) 5.10 Exam
What are two minimum prerequisites for live migration to succeed? (Choose two.)
What is the expected operation during node addition when the new node has a different AOS version?
An administrator needs to run a mixed Exchange and SQL workload with a guaranteed amount of container
space for each application.
How should the administrator meet this requirement?
A node with Erasure Coding fails. What is the impact?
An administrator needs to shut down an AHV cluster to relocate hardware. The administrator upgrades NCC and runs health checks.
Which steps should the administrator perform next?
Item instructions: For each procedure, indicate the order in which that procedure must take place to meet the item requirements.

How many SSL certificates are used by Prism Element on a Nutanix cluster?
A customer has a 24-node cluster with all containers configured with RF3. Two different nodes have incurred a simultaneous HDD failure.
What is the result?
What requires iSCSI initiator configuration in the guest OS to use Volumes:
An administrator is configuring cross-hypervisor DR from an ESXi cluster to a new AHV cluster. When the administrator migrates a protection domain to the AHV cluster, the VMs fail to boot.
What should the administrator do to correct this problem?
Cycle Management Perform Inventory.
Which port number should be used to configure LDAP?

