Pre-Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

Nutanix NCP-BC-7.5 - Nutanix Certified Professional - Business Continuity (NCP-BC) 7.5

Page: 3 / 4
Total 109 questions

An administrator incorrectly used the " Activate " functionality on the PD to test failover of VMs from production to DR cluster. The VMs were successfully restored on the DR side. What steps are needed to clean up the VMs on the DR side and resume normal operations on the Production cluster?

A.

Use the Activate functionality on the production cluster.

B.

Deactivate PD and destroy VMs on the production cluster.

C.

Manually delete the VMs on the DR cluster.

D.

Deactivate PD and destroy VMs on the DR cluster.

An administrator needs to perform a test failover on a Recovery Plan. What is the primary goal of this action?

A.

Copy data from primary to recovery location before failover happens.

B.

Perform a live production cutover and permanently switch all workloads to the recovery site.

C.

Validate recoverability and network mappings without impacting production systems.

D.

Disable replication before a planned maintenance window.

An administrator notices that the link between the source and destination clusters gets overutilized during recovery point replication. The company secured a new 10G connection between the two clusters.

What configuration should the administrator use so that the replication traffic uses the new 10G link?

A.

Configure Flow Rules.

B.

Configure Network Segmentation for DR.

C.

Configure Network Segmentation for Volumes.

D.

Configure Backplane Network.

An organization has two Nutanix clusters managed by a single Prism Central (PC) instance. They intend to implement Synchronous Replication between the sites. During a failover test, the administrator notices that automatic failover does not occur when the primary site ' s storage becomes unavailable. What is the most likely cause of this behavior based on an analysis of the requirements?

A.

The RTT is likely more than 5ms, which disables automatic failover.

B.

Automatic failover is only supported when the clusters are managed by two different PC instances.

C.

Synchronous replication does not automatically failover without a Witness.

D.

Automatic failover is only supported for network outages and not for storage outages.

A VM is configured with a 5-minute Nearsync RPO. After several hours, replication transitions back to hourly RPO. Alerts indicate the minute schedule cannot be maintained. What is the most likely root cause?

A.

RTT is greater than 5 ms.

B.

Only one recovery plan exists.

C.

Reverse synchronization is disabled.

D.

Bandwidth is insufficient.

A Protection Policy is configured with a Nearsync replication schedule (15-minute RPO). An administrator observes that the system has temporarily transitioned to an hourly replication schedule. Which scenario would cause this automatic transition from Nearsync to Asynchronous (hourly) replication?

A.

The Nutanix Cloud Infrastructure license expired.

B.

The bandwidth is insufficient for the change rate.

C.

A new VM was added to the protection category, triggering a full initial sync.

D.

A Test Failover operation is currently running on the recovery site.

An administrator is tasked with verifying the cluster ' s disaster recovery capability. The administrator needs to validate the capability without impacting the production VMs on the Source cluster and ensure that the destination cluster can bring up all the protected VMs. How can the administrator perform a failover?

A.

Perform validation of the Recovery Plan.

B.

Perform unplanned failover of the Recovery Plan.

C.

Perform a test failover of the Recovery Plan.

D.

Perform a planned failover of the Recovery Plan.

An administrator is planning a scheduled maintenance window that will temporarily interrupt network connectivity between the primary and recovery sites. Several Tier 1 VMs are protected with a Synchronous replication Protection Policy. What must the administrator do before beginning the maintenance window to prevent these VMs from becoming unresponsive without making RPO changes?

A.

Execute an Unplanned Failover to move the VMs to the recovery site before the maintenance window begins.

B.

Manually pause Synchronous replication in Prism Central before the maintenance window begins.

C.

Change the Protection Policy from Synchronous to Asynchronous replication prior to the maintenance window.

D.

Update the Synchronous replication policy to enable manual failover handling.

An administrator wants to protect the snapshots created on the cluster. Only authorized users should be allowed to modify or delete the snapshots on the cluster. How can the administrator harden the security of the snapshots?

A.

Configure CVM and AHV hardening.

B.

Configure a backup user with admin privileges.

C.

Configure cluster lockdown and use SSH keys.

D.

Configure Approval policy for snapshots.

A Nutanix protection policy is configured with:

    RPO: 1 hour,

    Retention period: 5 days,

    Retention type: Roll-up.

After six days of continuous operation, approximately how many hourly recovery points will still be available for restores for the most recent 24-hour period?

A.

0 hourly recovery points — only daily roll-ups are kept

B.

1 hourly recovery point — the latest only

C.

24 hourly recovery points — the last day only

D.

120 hourly recovery points — all hourly snapshots from 5 days