Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

Nutanix NCP-MCI-6.10 - Nutanix Certified Professional - Multicloud Infrastructure (NCP-MCI v6.10)

Page: 4 / 4
Total 119 questions

An administrator is configuringNutanix Disaster Recovery (DR)for across-hypervisor setup (ESXi to AHV)but finds thatguest VMs do not recover properly at the DR location.

What is required for a successful cross-hypervisor DR event?

A.

Utilize delta disks.

B.

Deploy Legacy BIOS boot on hosts within the cluster.

C.

Use raw device mappings.

D.

Nutanix Guest Tools (NGT) must be installed on source guest VMs.

Per organizational requirements, an administrator has uploaded a signed SSL certificate to Prism for Common Access Card (CAC) authentication.

Once the certificate has been uploaded successfully, the certificate appears to be valid but CAC authentication is not functional.

What is a potential cause of this problem?

A.

There is no Certificate Revocation List (CRL) configured.

B.

RSA key size is incorrect.

C.

Online Certificate Status Protocol (OCSP) is not enabled.

D.

Signature Algorithm is incorrect.

Due to requirements from the network team, a Nutanix administrator must create User VMs on VLAN 10 on multiple AHV clusters.

What network configuration should the administrator consider in order to ensure consistent connectivity for User VMs on VLAN 10?

A.

Bond Type

B.

MAC Address Prefix

C.

Virtual Switch Configuration

D.

MTU

Theteam leads of a development environmentwant tolimit developer accessto a specific set ofVMs.

What is the most efficient way to enable the team leads to directly manage these VMs?

A.

Create arole mappingfor each team lead and assign appropriately.

B.

Create aVPCfor each team lead and give themVPC Admin.

C.

Create aProjectfor each team lead and assign access.

D.

CreateSecurity Policiesto isolate users.

After addingnew workloads, theOverall Runwayis nowbelow 365 days, but thescenario still shows the cluster is in good shape.

Why?

A.

Because Storage Runway is still good.

B.

Because new workloads are sustainable.

C.

Because there are recommended resources.

D.

Because the Target is 1 month.