What is an element of CALMR?

A.

Recovery

B.

Application security

C.

Compliance

D.

Metrics

Which technical practice incorporates build-time identification of security vulnerabilities in the code?

A.

Dynamic code analysis

B.

Penetration testing

C.

Application security

D.

Threat modeling

What does Value Stream Mapping help reveal in the Continuous Delivery Pipeline?

A.

Who is responsible for optimizing the Value Stream

B.

Where automation is needed

C.

Bottlenecks to the flow of value

D.

DevOps practices that will improve the Value Stream

How should developers integrate refactoring into their workflow?

Choose the correct option from below list

A.

Refactor continuously as part of test-driven development

B.

Allocate a portion of their capacity to refactoring in every Iteration

C.

Create and estimate refactoring Stories in the Team Backlog

D.

Create and estimate refactoring tasks for each Story in the Team Backlog

Which two areas should be monitored in the Release on Demand aspect to support DevOps and Continuous Delivery? (Choose two.)

A.

Full-stack system behavior

B.

Build status

C.

Agile Release Train velocity

D.

Deployment cycle time

E.

Business Metrics

What marks the beginning of the Continuous Delivery Pipeline?

A.

A checked-in change

B.

A committed Feature

C.

An idea

D.

A committed user story

Weighted shortest job first is applied to backlogs to identify what?

Choose the correct option from below list

A.

Maximum economic value

B.

Epics, Features, and Capabilities

C.

User business value

D.

Proxy for job size

Which statement describes the Lean startup lifecycle?

A.

Define the minimum viable product (MVP), build the MVP, implement Epic Features until all Features are delivered

B.

Define the hypothesis, build a minimum viable product (MVP), continuously evaluate the MVP while implementing additional Features until WSJF determines work can stop

C.

Define a Lean business case, build a minimum viable product, implement the Epic Features until all Features are delivered

D.

Create a hypothesis statement, assign an Epic owner, deliver Features created from the Lean business case, deploy

Why is hypothesis evaluation important when analyzing data from monitoring systems in the Release on Demand aspect?

A.

It helps define the minimum viable product (MVP)

B.

It helps operations teams know where to apply emergency fixes

C.

It helps quickly create balanced scorecards for stakeholder review

D.

It helps link objective production data to the hypothesis being tested

Which statement describes what could happen when development and operations do not collaborate early in the pipeline?

A.

Flow times are reduced

B.

Teams build things quickly but build the wrong things

C.

Surprises are found in deployment that lead to significant rework and delay

D.

Automation of integration test is not possible