Test automation is typically included in the Definition of Done (DoD).

A.

True

B.

False

When is the Solution Demo conducted?

A.

On demand.

B.

At the end of each Sprint.

C.

At the end of each PI.

D.

Mid-PI.

Backlog items in an Expedite class of service can break WIP limits.

A.

True

B.

False

What is NOT a good Definition of Done (DoD)?

A.

The Customer is satisfied with the User Experience.

B.

Nonfunctional Requirements are met.

C.

Code is checked in and merged into main branch.

D.

No must-fix defects exist.

E.

All unit tests are passing.

F.

Coding standards have been followed.

What is the most effective way to train the System Team members to operate effectively as part of the train?

A.

Have them attend Leading SAFe training and Scrum Master orientation.

B.

Have them attend Leading SAFe training.

C.

Have them attend SAFe for Teams training with all other teams on the train.

D.

Have them attend Implementing SAFe training with SPC certification.

E.

Have them review the SAFe Foundations presentation and provide on-the-job training.

(Select 3) What primary roles are most responsible for ensuring successful execution at the Value Stream Level?

A.

Solution Management

B.

Value Stream Engineer

C.

Solution Architect/Engineer

D.

Customer

E.

Release Management

(select 3) What does relentless improvement, as defined in SAFe, include?

A.

Hold people accountable.

B.

Hold employee reviews to provide fast feedback.

C.

Optimize the whole.

D.

Apply Lean problem-solving tools and techniques.

E.

Reflect at key Milestones.

SAFe uses Kanban to manage flow at the Portfolio Level for the following reasons EXCEPT __________.

A.

To ensure that the analysis and discovery work needed for the items are not time bound.

B.

To ensure that there is visibility and transparency.

C.

To capture all ideas in the funnel.

D.

To limit the number of initiatives under consideration.

E.

To ensure that portfolio items are delivered to the Program or Solution Backlogs every 2 weeks.

What is NOT a SAFe-recommended practice for DevOps?

A.

Maintain development and test environments to better match production.

B.

Deploy to staging every sprint.

C.

Put everything under version control.

D.

Start automating the actual deployment process.

E.

Build and maintain a production-equivalent staging environment.

F.

Continuously synchronize all Feature and team branches.

G.

Create the ability to automatically build environments.

(Select 2) What steps in the Portfolio Kanban are most appropriate for running research spikes?

A.

Analysis-spikes help clarify feasibility.

B.

Implementing-teams perform spikes as usual

C.

Funnel-understand whether the Epic makes sense.

D.

Portfolio Backlog-run a spike before pulling into development.