Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

WELL WELL-AP - WELL Accredited Professional (WELL AP) Exam

Page: 4 / 7
Total 204 questions

At what stage are documents created that represent policies and operations schedules that are planned to be implemented?

A.

Intent

B.

Implementation

C.

Schedule review

D.

Performance verification

Please click on the Project Scenario A button to review the project scenario and answer the following question.

MILO DESIGN STUDIO - SHENZHEN, CHINA - PROJECT SCENARIO A

MILO is a small, multi-disciplinary design studio with 30 employees located in Shenzhen, China. Their

primary business is interior commercial fit-outs and they also offer sustainability consulting. Three of their employees have achieved their WELL AP credential.

They have recently leased one floor 21,528 ft.a (2 000 m2) in a building owned by another organization to use as their new studio office. This space includes floor to ceiling windows on all four exterior walls. While the windows are numerous, they are also highly tinted, with a visible light transmittance of approximately 0.35 (35%). They intend on installing several living plant walls and have included natural fibers and patterns in their finishings throughout.

Their building is located 984.25 ft. (300 m) from an underground train station and across the road (approx. 328.08 ft. (100 m)) from a large public park. While many employees have indicated that they bike to work on bike trails, the new building's landlord will not allow tenants to use the elevators to bring bicycles to their offices. Instead, their building has bike racks at the building entrance, an underground garage for bike storage, small rentable lockers and basic bike maintenance tools.

MILO considers itself a human-centric design firm and leads with a people-first approach through its

employee benefits and organizational policies. As an example, they offer a 50% discount on several

mindfulness apps and make guided meditation courses available twice per year to all employees on-site.

PROJECT SCOPE & GOALS

MILO has enrolled their office for WELL Certification to demonstrate their commitment to designing for well-being and employee health. They will be renovating and designing the entire fit-out themselves, including new space configurations that will prioritize natural light.

The space layout will include seating for 45 people in an open-plan office with hot-desking, three conference rooms and four individual phone booths. Additionally, they are planning to update lighting fixtures and purchase new office furniture. MILO do not provide any food or beverages on a daily basis except coffee and tea.

MILO is targeting WELL Certification at the Gold level or higher. This effort is being led by one of their inhouse WELL APs.

Which additional Nourishment feature could the protect achieve?

A.

Feature N07: Nutrition Education by offering in-person or virtual gardening or planting workshops focused on edible plants at no cost on a quarterly basis

B.

Feature N08: Mindful dating by offering a daily meal break of at least 20 minutes

C.

Feature N12 Food Production by offering at least 50% of total produce line and 25% of total animal product line as certified organic

D.

Feature N13: Local Food Environment by providing a designated eating space within a 650 ft. (200 m) walking distance

Exposure to which of the following contributes to Orcadian photoentrainment. resulting in a "phase advance’’ shift of the circadian phase?

A.

Late morning sunlight

B.

Early morning sunlight

C.

tarty evening computer monitor illumination

D.

Late afternoon computer monitor illumination

Which of the following most affects respiratory health?

A.

Polychlorinated biphenyls (PCBs)

B.

Volatile organic compounds (VOCs)

C.

Chromated copper arsenates (CCAs)

D.

Perfluorinated alkyl compounds (PFCs)

A project team performed quarterly water testing and determined that the total dissolved solids (TDS) is above the 500 mg/L threshold. Which of the following steps should the project team take to address this issue?

A.

Remediate and retest within one month

B.

Increase the number of sample points and retest

C.

Provide additional tests from highest and lowest floors

D.

Pretest one month before next performance verification

A project's site previously housed a fuel station and an automotive repair shop. Which strategy should the WELL AP recommend?

A.

Hire an experienced professional to perform an environmental site assessment

B.

Engage the local community to create a strategic approach about historical use of the site

C.

Inspect the site to see if any evidence of the fuel station or automotive repair shop remains

D.

Determine if the site is a recognized Brownfield or has a similar designation from the relevant authority

In addition to addressing a variety of emergency situations, what else must a project address in Feature C03: Emergency Preparedness?

A.

Business continuity plan

B.

Opioid response training

C.

Employee assistance fund

D.

Annual inventory of response resources

Which strategy could a project pursue to meet requirements in a precondition in the Mind concept?

A.

Provide free clinical screenings

B.

Provide ongoing volunteer opportunities

C.

Provide free mindfulness programming. including in-person yoga or virtual meditation classes

D.

Provide educational material regarding healthy nutrition, including recipes and cooking methods

A design for a WELL building has HVAC zones of 650 ft2 (60 m2) and less than 10 occupants for more than 90% of regularly occupied spaces. This design

A.

personalizes thermal comfort when provided with a ceiling fan per zone

B.

negates off-gassing when provided with an increased outdoor air supply

C.

reduces mold and bacterial growth within the building's mechanical system

D.

enhances thermal comfort when used in conjunction with a user-adjustable tormontat

An architect interested in incorporating biophilia has chosen to include water features in the design Which of the following related features will be impacted by this strategy?

A.

Feature M05 Stress Management

B.

Feature C09: New Mother Support

C.

Feature W07 Moisture Management

D.

Feature X05 Enhanced Material Restrictions