Oracle 1z0-1042-25 - Oracle Cloud Infrastructure 2025 Application Integration Professional
You need to create a schedule pattern integration that is based on an existing application pattern integration. How can this be achieved while using the same display name as the original integration?
You have a use case that requires a large data extract, which is more than 10MB, to be processed within an Oracle Integration Cloud (OIC) integration. Which are three valid options?
Once they have been configured, which actions are allowed to be repositioned to another location within the design canvas of an orchestration-style integration flow? Select THREE.
As an Oracle Integration Cloud (OIC) specialist, you are tasked with implementing a scheduled integration between two enterprise applications. The client requires that the integration be run every weekday at 3:00 PM to synchronize data between the systems. Which advanced scheduling configuration expression will you use?
You are designing a new integration in OIC that needs to expose a RESTful interface trigger for client applications. Which is a valid consideration while choosing request and response options using the REST Adapter Endpoint Configuration wizard?
You have an Oracle Integration (OIC) synchronous integration flow that updates external systems with several invocations. However, several of your OIC integration clients are reporting that they are experiencing timeouts waiting for the response confirmation from this processing. Which is a legitimate strategy to mitigate this issue?
Where in the Observability pages can you view aggregated instance metrics for an integration, such as the total counts and the minimum (quickest), maximum (slowest), average (mean), and standard (largest) deviation execution times for a selected time period?
One of your downstream applications is becoming overwhelmed with too many individual synchronous invocations from your current Oracle Integration (OIC) integration. It is recommended that you redesign the integration to take advantage of the batch processing capabilities of that application. Which approach is a valid OIC design best practice that will provide the best solution for this issue?
Which statement is valid regarding connection resources in Oracle Integration Cloud (OIC)?
You are configuring an ERP Cloud Adapter connection invoke action within an Oracle Integration Cloud (OIC) integration. How many child resources can you select?