The architect documented a requirement for 99.95% high availability to meet the customer's resiliency needs.

Which two physical design decisions will help meet this requirement in the management domain? (Choose two.)

A.

Management Port Group: Route based on physical NIC load

B.

Host Overlay DHCP Scope Lease: 14 Days

C.

Physical Switch MTU: 9000

D.

vSAN Cache Tier Sizing: 800GB

E.

Host isolation response: Power Off and restart VM

Requirement: The solution must include high security hardening levels to meet military compliance standards.

Which two physical design decisions will meet this security requirement in the workload domain? (Choose two.)

A.

The vSAN storage policy will be configured as Secondary Failures to Tolerate = 1.

B.

VCF Operations will be configured to renew the SSL certificate for vCenter Server per security policies.

C.

NTP will be configured to the internal NTP servers of 192.168.12.1 and 192.168.24.1.

D.

The advanced setting UserVars.SuppressShellWarning will be configured to 0 across all ESXi hosts.

E.

The certificate of the VI workload domain vCenter Server will be issued by RootCA.Military.Domain.Com.

A customer is designing a multi-site VMware Cloud Foundation (VCF) and vSAN Data Protection (DP) architecture to ensure business continuity. The customer's support team must validate the failover and recovery processes before being allowed to deploy into production.

Which two validation activities should be included in the strategy to meet the objective? (Choose two.)

A.

Conduct recovery plan testing annually, as frequent testing may introduce instability in DR environments.

B.

Assess the impact of failover scenarios on application dependencies and inter-site connectivity.

C.

Configure recovery plans based on generic VMware best practices rather than workload-specific requirements to decrease the architecture complexity.

D.

Perform planned and unplanned failover tests in a controlled environment to validate recovery time objectives.

E.

Configure vSphere HA and DRS features to manage disaster recovery automatically, eliminating the need for additional validation.

An architect is designing a new VMware Cloud Foundation (VCF) solution. They are meeting with the key stakeholders and subject matter experts (SMEs) for the first time as part of the requirements gathering process. The following information has been shared with the architect prior to the meeting:

    Names and job titles of the attendees

    Project timelines and budget

What step should the architect perform as part of this initial requirements gathering workshop?

A.

Open the meeting with a diagram of the VCF topology that must meet the customer requirements in order to start a discussion.

B.

Ask questions to agree on the key product features the SMEs want from the design.

C.

Open the meeting with a list of the VCF design decisions from the public documentation to agree on any required changes.

D.

Ask questions to start a discussion on the business objectives and desired outcomes.

During a design workshop, the customer provided the following requirement:

• Business units should not be able to interfere with the operations of a different business unit.

As a result of this requirement, the architect makes the decision to enable multi-tenancy within VCF Automation.

A combination of which two design implications would also need to be documented? (Choose two.)

A.

Each Tenant must use an embedded VCF Operations orchestrator instance.

B.

Each Tenant must use an external VCF Operations orchestrator instance.

C.

The Provider Tenant must use the embedded VCF Operations orchestrator instance.

D.

All Tenants must use a single VCF Operations orchestrator instance.

E.

The Provider Tenant must use an external VCF Operations orchestrator instance.

During a requirements gathering workshop, several business and technical requirements were captured from the customer.

Which requirement will be classified as a Business Requirement?

A.

The solution must provide the best end-user experience.

B.

The solution must allow the migration of legacy server infrastructure.

C.

The solution must consider security and resiliency to ensure business continuity.

D.

The solution must provide a component-level SLA of 99.9% or higher.

An architect is designing a solution with Istio Service Mesh.

What two types of groups can collect and manage objects? (Choose two.)

A.

Service

B.

Cluster

C.

Security

D.

API

E.

Node

VMware Kubernetes Service (VKS) cluster exposes three layers of controllers to manage its lifecycle.

Which set correctly identifies these layers?

A.

Virtual Machine Service, vCenter Appliance, Supervisor Service.

B.

Cluster API, Node Problem Detector, CNI Plugin.

C.

API Gateway, StatefulSet Controller, Ingress Controller.

D.

Virtual Machine Service, Cluster API, and Cloud Provider Plugin.

As part of an initial stakeholder meeting, one of the stakeholders has stated the following:

• According to the hardware standards, all new host server hardware must be deployed using our selected hardware vendor and server model.

How would the architect classify this statement?

A.

An assumption

B.

A constraint

C.

A requirement

D.

A risk