VMware 2V0-13.25 - VMware Cloud Foundation 9.0 Architect
The architect documented a requirement for 99.95% high availability to meet the customer's resiliency needs.
Which two physical design decisions will help meet this requirement in the management domain? (Choose two.)
Requirement: The solution must include high security hardening levels to meet military compliance standards.
Which two physical design decisions will meet this security requirement in the workload domain? (Choose two.)
A customer is designing a multi-site VMware Cloud Foundation (VCF) and vSAN Data Protection (DP) architecture to ensure business continuity. The customer's support team must validate the failover and recovery processes before being allowed to deploy into production.
Which two validation activities should be included in the strategy to meet the objective? (Choose two.)
An architect is designing a new VMware Cloud Foundation (VCF) solution. They are meeting with the key stakeholders and subject matter experts (SMEs) for the first time as part of the requirements gathering process. The following information has been shared with the architect prior to the meeting:
Names and job titles of the attendees
Project timelines and budget
What step should the architect perform as part of this initial requirements gathering workshop?
During a design workshop, the customer provided the following requirement:
• Business units should not be able to interfere with the operations of a different business unit.
As a result of this requirement, the architect makes the decision to enable multi-tenancy within VCF Automation.
A combination of which two design implications would also need to be documented? (Choose two.)
During a requirements gathering workshop, several business and technical requirements were captured from the customer.
Which requirement will be classified as a Business Requirement?
An architect is designing a solution with Istio Service Mesh.
What two types of groups can collect and manage objects? (Choose two.)
VMware Kubernetes Service (VKS) cluster exposes three layers of controllers to manage its lifecycle.
Which set correctly identifies these layers?
As part of an initial stakeholder meeting, one of the stakeholders has stated the following:
• According to the hardware standards, all new host server hardware must be deployed using our selected hardware vendor and server model.
How would the architect classify this statement?
