An administrator is unable to log into the vRealize Operations (vROps) UI and therefore logs into the vROps Admin Ul to begin troubleshooting. Once logged into the Admin UI, the Mowing error message has been displayed:
The Cluster was shut down because one or more nodes were out of disk space.
The following information has been provided on the vROps deployment:
• The vROps cluster contains three nodes.
• Each node in the vROps duster has been hardened.
• Continuous Availability (CA) and High Availability (HA) is not configured.
Drag and drop the four correct actions the administrator must complete to troubleshoot the cause of the issue from the action list on the left and place the actions into the correct sequence on the right. (Choose four.)
In vRealize Operations, a user applies a CPU License to a custom group which has existing hosts. How will the Virtual Machines (VMs) on the existing hosts be affected?
An administrator is attempting to install a new management pack on to a 2-node vRealize Operations duster but the installation is failing. Which two actions can the administrator take to troubleshoot the issue? (Choose two.)
Which three deployment architectures are valid for vRealize Log Insight listed below? (Choose three.)
Which statement is correct about the deployment process for vRealize Log Insight using vRealize Suite Lifecycle Manager?
An administrator would like to monitor third-party storage array metrics in vRealize Operations Which three steps should the administrator take to complete this objective? (Choose three.)
A vRealize Log Insight (vRLI) administrator wants to search archived logs for certain events. What are the required steps to provide the administrator the ability to search the log messages?
An administrator has been tasked with deploying vRealize Operations using vRealize Suite Lifecycle Manager (vRSLCM). Which two options are steps in the process? (Choose two.)
An administrator has been tasked with creating an identically configured deployment of the production vRealize Operations duster that is currently managed by vRealize Suite Lifecycle Manager (vRSLCM).
Which four steps should the administrator complete to meet this objective? (Choose four.)
Which three types of Virtual Machine (VM) action can be scheduled in a vRealize Operations Automation Central job? (Choose three.)