Halloween Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: newyear

Cisco 350-801 - Implementing Cisco Collaboration Core Technologies (350-801 CLCOR) v2.0

Page: 14 / 15
Total 489 questions

An engineer with ID012345678 must build an international dial plan in Cisco UCM. Which action is taken when building a variable-length route pattern?

A.

configure single route pattern for international calls

B.

set up all international route patterns to 0.!

C.

reduce the T302 timer to less than 4 seconds

D.

create a second route pattern followed by the # wildcard

What must be configured on a Cisco Unity Connection voice mailbox to access the mailbox from a secondary device?

A.

mobile user

B.

alternate names

C.

alternate extensions

D.

Attempt Forward routing rule

Which two technical reasons make QoS a necessity in a video deployment? (Choose Two)

A.

Low response time between endpoints

B.

Provisioned bandwidth of the link

C.

Variable bit rate of the video stream

D.

Bursly behavior of video traffic

Which percentage of the link bandwidth must streaming unicast video be limited to according to Cisco QoS Baseline adoption?

A.

10 percent

B.

13 percent

C.

15 percent

D.

20 percent

Which endpoint feature is supported using Mobile and Remote Access through Cisco Expressway?

A.

SSO

B.

H.323 registration proxy to Cisco Unified Communications Manager

C.

MGCP gateway registration

D.

SRST

An engineer deploys a Cisco Expressway-E server for a customer who wants to utilize all features on the server. Which feature does the engineer configure on the Expressway-E?

A.

H.323 endpoint registrations

B.

Mobile and Remote Access

C.

SIP gateway for PSTN providers

D.

VTC bridge

What are the predefined call handlers in Cisco Unity Connection?

A.

opening greeting, welcome, and default system

B.

caller input, greetings, and transfer

C.

greetings, operator, and closed

D.

opening greeting, operator, and goodbye

Refer to the exhibit. Which outgoing m-line SDP is sent to Cisco UCM after matching the appropriate dial peers via Cisco Unified Border Element?

A.

B.

C.

D.

An administrator needs to create a partial PRI consisting of the first seven timeslots available. Which configuration snippet configures the ISDN E1 PRI for this task?

A.

B.

C.

D.

An engineer is configuring a new administrative user in Control Hub The user must only have access to activity reports and must not be allowed any other management functions The engineer already created the user (ActUser) and navigated to Control Hub > Users > ActUser > Administrator Roles Which check box must be selected next to complete the configuration?

A.

Support admin

B.

Security activity admin

C.

Compliance officer

D.

Device admin