VMware 3V0-42.20 - Advanced Design VMware NSX-T Data Center
An architect is helping an organization with the Logical Design of an NSX-T Data Center solution.This information was gathered during the Assessment Phase:
Maximum performance and availability is required between the physical and virtual network.
Load Balancing service is required for back-end web servers.
NAT is required.
Which selection should the architect include in their design? (Choose the best answer.)
An architect is helping an organization with the Logical Design of a Layer 2 bridging solution.
This information was gathered during the Assessment Phase:
Workloads are running on ESXi hosts.
Workloads are running on KVM hosts.
Workloads on hypervisors should use bridging services.
VLAN 50 is used for Tier-0 uplink connectivity.
Which selection should the architect include in their design? (Choose the best answer.)
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution.
This information was gathered during a workshop:
There are six hosts and hardware has already been purchased.
Customer is planning a collapsed Management/Edge/Compute cluster.
Each host has two 10Gb NICs connected to a pair of switches.
There should be no single point of failure in any proposed design.
Which virtual switch design should the architect recommend to the organization? (Choose the best answer.)
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution.
This information was gathered during a workshop:
Current hypervisor of choice is KVM.
Cost reduction is important.
Which two selections should the architect recommend to the organization? (Choose two.)
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution.
This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
There are applications which use IPv6 addressing.
Network administrators are not familiar with NSX-T Data Center solutions.
Hosts can only be configured with two physical NICs.
There is an existing management cluster to deploy the NSX-T components.
Dynamic routing should be configured between the physical and virtual network.
There is a storage array available to deploy NSX-T components.
Which risk was documented by the architect? (Choose the best answer.)
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution.
This information was gathered during a workshop:
Some workloads should be moved to a Cloud Provider.
Extend network’s VLAN or VNI across sites on the same broadcast domain.
Enable VM mobility use cases such as migration and disaster recovery without IP address changes.
Support 1500 byte MTU between sites.
Which selection should the architect include in their design? (Choose the best answer.)
An architect is helping an organization with the Conceptual Design of an NSX-T Data Center solution.This information was gathered by the architect during the Discover Task of the Engagement Lifecycle:
There are applications which use IPv6 addressing.
Network administrators are not familiar with NSX-T Data Center solutions.
Hosts can only be configured with two physical NICs.
There is an existing management cluster to deploy the NSX-T components.
Dynamic routing should be configured between the physical and virtual network.
There is a storage array available to deploy NSX-T components.
Which two requirements were documented by the architect? (Choose two.)
A Solutions Architect is assisting a service provider with designing an NSX-T Data Center solution for these environments:
Virtual Data Center to Virtual Data Center connectivity
Tenant workload on-boarding to Virtual Data Centers.
These requirements must be met:
scalability across 5 data centers
all sites have a latency of 180ms
MTU between sites is 1800
bandwidth is 100Mbps between sites
multi-tenancy
Which two selections should the Solutions Architect propose to the service provider? (Choose two.)
An architect is helping an organization with the Physical Design of an NSX-T Data Center solution.
This information was gathered during the Assessment Phase:
There is a critical application used by the Finance Team.
The critical application has an availability and recoverability SLA of 99.999%.
The critical application is sensitive to network changes.
Which two selections should an architect include in their design? (Choose two.)
What selection is the key design benefit provided by a dedicated Edge Cluster VM or Bare Metal? (Choose the best answer.)