Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

VMware 5V0-31.22 - VMware Cloud Foundation Specialist (v2)

Page: 1 / 4
Total 116 questions

A systems administrator is implementing stretched clusters in an environment with multiple Availability Zones (AZs). Which statement accurately describes this design?

A.

For VLANs that are stretched between AZs, configure load balancing in the Layer 3 gateway between AZs

B.

Layer 3 networks must be stretched between the AZs by the physical infrastructure

C.

The Layer 3 gateway for the workload domain and Edge overlay networks must be highly available across the AZs.

D.

If VLAN is stretched between AZ1 and AZ2, the Layer 3 network must also be stretched between the two AZs.

What are the correct steps to grant the DevOps team permissions to a vSphere Namespace in a VMware Cloud Foundation (VCF) developer-ready workload domain while following the principle of least privilege access?

A.

At the Permissions setting, add the DevOps group and assign the “Editor” permission

B.

At the Global Permissions setting, add the DevOps group and assign the vSphere Kubernetes Manager role

C.

At the Global Permissions setting, add the DevOps group and assign the SupervisorService Cluster Operator role

D.

At the Permissions setting, add the DevOps group and assign the “Can edit” permission

Which three options are valid use cases for multiple clusters in a workload domain? (Choose three.)

A.

Workload domain with multiple availability zones each containing clusters

B.

Workload domain with multiple clusters in one rack

C.

One cluster stretching two workload domains

D.

Two clusters forming one stretched workload domain

E.

One stretched cluster across two regions and two workload domains

F.

One cluster distributed across two racks and one workload domain

Which functionality does a NSX Tier-1 Gateway provide to a vSphere with Tanzu deployment?

A.

Downlink connection to segments

B.

Downlink connection to Tier-0 gateway

C.

Layer 2 Switching

D.

Static or dynamic routing

An architect is designing a new vSAN cluster to be added to an existing workload domain for a customer who is on a tight budget.

What is the minimum number of hosts required for this additional cluster?

A.

4

B.

3

C.

1

D.

2

During a VCF design workshop, the architect gathered the following customer requirements:

• There must be two environments: PROD and DEV.

• PROD and DEV should be administratively separated.

• PROD will use two different hardware server types, and DEV will only use one hardware server type.

• The VCF infrastructure design should be flexible and scalable as much as possible

How many NSX local managers in total will be provisioned after deploying the full VCF infrastructure?

A.

6

B.

3

C.

12

D.

9

An administrator is tasked with enabling workload management for a VMware Cloud Foundation Management Workload Domain. This set of requirements was collected during the design workshops:

• Developers should be able to utilize vSphere Pods feature.

• Embedded harbor registry feature should be supported.

• Developers need to utilize persistent volumes across multiple provisioned vSphere Pods.

Which three actions will meet the requirements for this deployment? (Choose three.)

A.

Configure HA Proxy.

B.

Enable vSAN File Services.

C.

Enable vSphere HA and DRS in fully-automated mode

D.

Enable vSphere HA and DRS in partially-automated mode.

E.

Configure NSX Advanced Load Balancer.

F.

Configure NSX-T Networking.

An architect needs to create a VMware Cloud Foundation (VCF) VI Workload Domain design with the following requirements:

• Design blueprint needs to be repeatable for additional regions

• Multiple availability zones

• Seven nodes per availability zone to host the workloads

• vSAN storage will be used

What is the maximum accepted latency supported by vMotion between the two availability zones?

A.

100 ms

B.

150 ms

C.

10 ms

D.

200 ms

An architect needs to create a VMware Cloud Foundation (VCF) VI Workload Domain design with these requirements:

• Design blueprint needs to be repeatable for additional regions

• Multiple availability zones

• Seven nodes per availability zone to host the workloads

• vSAN storage will be used

What is the maximum accepted latency supported by vSAN between the two availability zones'?

A.

10 ms

B.

100 ms

C.

150 ms

D.

5 ms

A customer is leveraging vRA to provision workloads to a consolidated VCF domain cluster. Due to the increased demand of customer workloads, more capacity is now needed. The architect provides information on scaling the customer’s consolidated design.

Which statement accurately characterizes this design?

A.

Migrating to a standard design will require redeploying the infrastructure from scratch.

B.

Migrating to a standard design should be considered after reaching 8 or 10 nodes in the consolidated design.

C.

A VMware GSS team must be involved during the process of migrating to a consolidated design.

D.

A consolidated design will not support the addition of multiple clusters.