API API-SIEE - Source Inspector Electrical Equipment

Page: 2 / 4
Total 110 questions

The Arc Flash PPE is required for:

A.

work on control circuits with exposed electrical conductors below 120 VAC.

B.

removal of covers on properly installed wireways, junction boxes, and cable trays.

C.

voltage-testing in ac systems with work on energized conductors.

D.

insulated cable examination with no manipulation of cable.

Within the context of NEMA ICS 1, which of the following describes PD 3?

A.

Moisture occurs continuously, dust quantity becomes conductive when moist, and pollution is sufficient to cause tracking and erosion at a high rate

B.

Moisture occurs occasionally, dust quantity is sufficient to become conductive when moist and pollution is sufficient to cause tracking or erosion at a slow rate

C.

Moisture does not occur, always dry, dust insignificant and no effect from pollution

D.

Moisture occurs frequently, dust quantity is sufficient to become conductive when moist, and pollution is sufficient to cause tracking or erosion at a moderate rate

In a Class I hazardous area, what is the maximum distance from an enclosure, containing arcing devices should a conduit seal be located?

A.

4 inches 10.16 cm away from the closest union or coupling

B.

10 inches 25.4 cm

C.

12 inches 30.48 cm

D.

18 inches 45.72 cm

According to API 541, determination of efficiency and power, locked-rotor current, power factor, torque, full-load current and slip are some of the tests verified when performing a:

A.

complete test.

B.

compliance test.

C.

design test.

D.

routine test.

A source inspector reviewing a control panel should verify wiring against which project document as a core inspection activity?

A.

Employee training log

B.

One-line wiring diagram

C.

Freight invoice

D.

Packing list only

What is the purpose of labeling the temperature range on electrical equipment used in a Class I hazardous area?

A.

To verify the process temperature and the equipment temperature have the same Class I rating

B.

To ensure that the equipment maximum temperature does not exceed the autoignition temperature of the specific gas or vapor to be encountered

C.

To ensure the equipment is compatible with the other Class I devices

D.

To verify the maximum process temperature does not exceed high levels

During transformer inspection, the source inspector should verify that alarm, control, and trip settings on temperature and level indicators are:

A.

omitted unless requested by operations

B.

identical for every transformer rating

C.

as specified

D.

determined only by the freight forwarder

What document is used for petroleum and chemical industry premium-efficiency, severe-duty, totally enclosed fan-cooled TEFC squirrel cage induction motors up to and including 370 kW 500 hp?

A.

API 546

B.

IEEE 141

C.

IEEE 841

D.

NFPA 70

According to NFPA 70, is the use of Teflon tape on threaded connections for conduits allowed?

A.

Only when installed in a Class I, Division 2 area

B.

Yes, the use of Teflon on metal raceways, cable armor, and other metal enclosures prevents water from entering

C.

No, metal raceways and other metal enclosures for conductors shall be metallically joined together into a continuous electrical conductor

D.

Yes, the use of Teflon ensures an explosion proof vapor seal

What would the equipment pictured below be used for?

A.

Precise measurement of shaft alignment

B.

Precise measurement of machined equipment requiring close tolerances

C.

Calibration of precision measuring equipment

D.

Verification of proper spacing between motor and gearbox