Which one of the following is a disadvantage of Water Cooled System?

A.

All components are located inside the CRAC

B.

Condenser water piping loops long distances

C.

Usage of the building's condenser water is less expensive than chilled water

D.

Introduces an additional source of liquid

Which one of the following controls the voltage produced at the output of the alternator?

A.

Voltage Meter

B.

Voltage Stabilizer

C.

Voltage Regulator

D.

Voltage Backup Device