AHA CHFM - Certified Health Care Facility Manager (CHFM)
Due to construction, the fire sprinkler system must be out of service for part of a hospital wing. Which of the following should be implemented immediately?
According to NFPA 13, when replacing standard response sprinkler heads with quick response heads, all heads must be replaced in the entire
The time that materials or assemblies have withstood a fire exposure, as established in accordance with test procedures of NFPA 251, is referred to as the
If a boiler combustion efficiency test indicates 22% excess oxygen at mid-firing rate, which of the following adjustments should be made?
Which of the following are likely to be included in the operations and maintenance operating budget?
training for mechanics
building improvements
utilities
vehicle repairs
The cost to replace an aging chiller should be part of an organization's
In accordance with The Joint Commission's Emergency Management Chapter, which of the following is one of the most effective tools to plan an emergency response exercise?
(Base Bid / Alternate A / Alternate B)
Company A: $18,000 / $2,000 / Not available
Company B: $20,000 / $3,000 / Included
Company C: $19,000 / $4,000 / $500
Company D: $19,000 / $4,000 / $1,000
Which company has the LOWEST cost if alternate B is chosen?
At the end of an 8-hour electrical shutdown, after the maintenance work is completed but before the cabinets are closed up or the system re-energized, a final inspection should be completed by individuals who have
In order to ensure a safe environment for patients, what department must be involved during the planning of all construction projects?