Due to construction, the fire sprinkler system must be out of service for part of a hospital wing. Which of the following should be implemented immediately?

A.

ICRA

B.

ILSM

C.

PASS

D.

RACE

According to NFPA 13, when replacing standard response sprinkler heads with quick response heads, all heads must be replaced in the entire

A.

compartment.

B.

zone.

C.

building.

D.

corridor.

The time that materials or assemblies have withstood a fire exposure, as established in accordance with test procedures of NFPA 251, is referred to as the

A.

flame spread rating.

B.

fire resistance rating.

C.

fire assembly rating.

D.

fire protection rating.

If a boiler combustion efficiency test indicates 22% excess oxygen at mid-firing rate, which of the following adjustments should be made?

A.

Shift to steam atomization.

B.

Increase the nozzle air pressure.

C.

No adjustment is necessary.

D.

Increase the fuel pressure.

Which of the following are likely to be included in the operations and maintenance operating budget?

training for mechanics

building improvements

utilities

vehicle repairs

A.

1, 2, and 3 only

B.

1, 2, and 4 only

C.

1, 3, and 4 only

D.

2, 3, and 4 only

The cost to replace an aging chiller should be part of an organization's

A.

capital budget.

B.

project fund.

C.

depreciation fund.

D.

operating budget.

In accordance with The Joint Commission's Emergency Management Chapter, which of the following is one of the most effective tools to plan an emergency response exercise?

A.

ILSM

B.

PCRA

C.

HVA

D.

ICRMR

(Base Bid / Alternate A / Alternate B)

Company A: $18,000 / $2,000 / Not available

Company B: $20,000 / $3,000 / Included

Company C: $19,000 / $4,000 / $500

Company D: $19,000 / $4,000 / $1,000

Which company has the LOWEST cost if alternate B is chosen?

A.

A

B.

B

C.

C

D.

D

At the end of an 8-hour electrical shutdown, after the maintenance work is completed but before the cabinets are closed up or the system re-energized, a final inspection should be completed by individuals who have

A.

been involved since the beginning of the shutdown.

B.

"fresh eyes" and go/no go authority.

C.

working knowledge of the generators and switch gear.

D.

gathered feedback and attended the lessons learned debriefing.

In order to ensure a safe environment for patients, what department must be involved during the planning of all construction projects?

A.

Information Technology

B.

Biomedical Engineering

C.

Patient Services

D.

Infection Control