Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

GAQM CLSSBB - Certified Lean Six Sigma Black Belt (CLSSBB)

Page: 5 / 11
Total 357 questions

Find the value of (7) in the ANOVA table. Assume:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

Calculate the main effect of factor A (i. e. A+ – A– ).

A.

46

B.

129

C.

83

D.

–46

E.

none of the above

There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPMO =:

A.

87 ÷ 328

B.

87 ÷ (328 × 14)

C.

14 ÷ 87

D.

87 ÷ 14 × 1,000,000

E.

328 ÷ 87

F.

87 × 1,000,000 ÷ (14 × 328)

Causes in a cause and effect diagram often include management, measurement systems, mother nature and the four standard causes:

A.

man, material, methods, machines

B.

man, manufacturing, methods, material

C.

marketing, methods, material, machines

D.

man, material, millennium, machines

E.

none of the above

George is an employee of Black, Inc. John is George’s internal customer. Which statement is true?

A.

John is employed by Black, Inc.

B.

John is employed by another company that supplies material to Black, Inc.

C.

John is employed by a company that purchases material from black, Inc.

D.

John is employed by another company that has a fiduciary agreement with Black, Inc.

E.

John is employed by another company as an internal auditor.

A team wants a technique for determining and displaying priorities based on frequency of various defect types. They should use:

A.

written and diagrammed work instructions

B.

flow charts and process maps

C.

cause and effect diagrams

D.

Pareto chart

E.

relationship matrix

SCENARIO

A Six Sigma team is measuring the moisture content of corn starch as it leaves the conveyer belt of a dryer. They collect one sample four cups of starch at times indicated in the chart at fixed locations labeled A, B, C, and D across the end of the belt. See the diagram below.

Find the equation of the regression line for these sample data points: (1, 7) (3, 3) ( 3, 2) (5, –1)

A.

y = 10.8 – 2.9x

B.

y = 12.9 + 5.2x

C.

y = 16 – 3.7x

D.

y = 8.75 – 2x

E.

y = 22.6 – 4.8x

Find the value of (1) in the ANOVA table. Assume:

A.

16.4

B.

3.2

C.

18.6

D.

23.2

E.

4.54

F.

12.2

G.

0.525

An automatic gaging system is to be installed in a process. The gage will insert data values into a data base from which machine adjustments will be made automatically. A critical factor in specifying the equipment is:

A.

communication link between gage and computer

B.

compatibility of software in the gage and in the computer

C.

adequate manual over-rides

D.

all of the above

There are 14 different defects that can occur on a completed time card. The payroll department collects 328 cards and finds a total of 87 defects. DPU =

A.

87 ÷ 328

B.

87 ÷ (328 × 14)

C.

14 ÷ 87

D.

87 ÷ 14

E.

328 ÷ 87

F.

87 × 1,000,000 ÷ (14 × 328)