GAQM CLSSGB - Certified Lean Six Sigma Green Belt (CLSSGB)
In order to standardize project savings financial calculation such project benefits can be compared the financial savings are typically calculated over what period of time?
The ____________ is important because it provides an estimate of the probability of an event occurring depending on the Standard Deviation from the Mean.
Measurement error is defined as the effect of all sources of measurement variability that caused an observed or measured value to deviate from the __________.
Use of the ________ approach is the most classic arrangement when constructing a Fishbone Diagram.
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
The actual experimental response data varied somewhat from what a Belt had predicted them to be. This is the result of which of these?
Unequal Variances can be the result of differing types of distributions.
Lean removes many forms of ______________ so Six Sigma can focus on reducing _______________.
When utilizing Statistics the population is defined as a collection of all the individual data points of interest.
A Six Sigma tool that helps to screen factors by using graphical techniques to logically subgroup multiple discrete X's plotted against a continuous Y is known as a ________________________Chart.