The producer's risk can be determined from the

A.

acceptance quality limit (AQL)

B.

lot tolerance percent defective (LTPD)

C.

average outgoing quality limit (AOQL)

D.

rejectable quality level (RQL)

The design function which assigns probability of failures between components or subsystems is called

A.

Apportionment.

B.

Significance

C.

Confidence.

D.

Qualification.

Which of the following elements of a quality system will help reduce errors and defects caused by conflicting work instructions?

A.

Product specifications

B.

Quality training

C.

Document control

D.

Cross-functional teams

The sample size for ANSI ASQ Z1.4. Level II plan is based on the

A.

size of the lot to be inspected

B.

size of the batch to be manufactured

C.

average size of production lots

D.

decision of the quality assurance manager

Which of the following symbols indicates a termination point on a flowchart?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

What is the appropriate number of class intervals for the construction of a histogram generated from 36 observations?

A.

4

B.

6

C.

8

D.

12

Several units from a random sample of units produced on Line 3 were found to be defective. Which of the following actions should be taken next?

A.

Segregate the defective units

B.

Measure all units produced on the line

C.

Ask someone to disposition the defective units

D.

Measure the units again to confirm they are defective

The primary characteristic of risk management is being

A.

simple

B.

reactive

C.

unnatural

D.

all-inclusive

The limits of a pre-control chart are based on

A.

specifications

B.

natural tolerance

C.

process standard deviation

D.

process capability

After attempting to prevent or control risk, which of the following types of risk will remain?

A.

Inherent

B.

Residual

C.

Control

D.

Credit