Weekend Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: newyear

ASQ CSQE - Certified Software Quality Engineer Exam

Page: 7 / 9
Total 280 questions

Which of the following best describes a process audit?

A.

The evaluation of established procedures

B.

An investigation of the quality management system

C.

The verification that product characteristics are met

D.

An internal review of the quality policy

The use of a rigorous mathematical proof to analyze the algorithm of a software component is a feature of

A.

boundary value analysis

B.

functional decomposition

C.

dynamic analysis

D.

formal methods

A software configuration baseline is best described as

A.

the installation of the configuration library

B.

one or more configuration items tested

C.

one or more configuration items approved

D.

one or more configuration items packaged for shipment

An environmental monitoring software system is required to measure ambient temperature and sound an alarm if the temperature drops below 19 3C or rises above 21 °C. Which of the following observed test results would be an error for this system?

A.

Temperature Display: 20 CC Alarm Status. Silent

B.

Temperature Display: Cannot measure Alarm Status: Silent

C.

Temperature Display: 15 °C Alarm Status Ringing

D.

Temperature Display: 21 °C Alarm Status Silent

Which of the following characterizes a usability requirement?

A.

The number of software users

B.

The useful life of a system

C.

The variety of tasks a user can perform

D.

The ease of using a system

Which of the following approaches best facilitates the analysis of software product and process metrics to enhance monitoring and reporting techniques?

A.

Conducting regular audits to ensure compliance with industry standards

B.

Integrating software development tools for better workflow visualization

C.

Implementing automated testing tools to increase the frequency of data collection

D.

Using statistical methods to determine correlations between process efficiencies and product defects

A software quality engineer is managing a project to develop a new air traffic control system for a federal agency When conducting a stakeholder needs analysis., which of the following groups would be most important for eliciting criteria for the functional tests?

A.

Current air traffic controllers

B.

Investigators at the transportation safety board

C.

Key associations that represent pilots and ground crews

D.

Purchasing and finance representatives from the federal agency

According to the ISO 9001 standard, who is responsible for ensuring the effectiveness of a quality management system?

A.

Executive management

B.

The quality director

C.

The project manager

D.

Software quality engineering

Which of the following steps comes first during release planning for waterfall-type projects?

A.

Define the scope of the software being developed.

B.

Determine which problems will be corrected in the next release.

C.

Select the set of requirements that will be included in the release.

D.

Confirm the implemented software meets the specified requirements.

Which of the following formulas should a reviewer use to calculate defect yield for a single review?

A.

100 × defects removed before compile ÷ defects injected before compile

B.

Defects per hour in Phase 1 ÷ defects per hour in unit testing

C.

100 × compile time × test time ÷ total development time

D.

100 × design review time plus code review time ÷ total development time