ASQ CSSBB - Certified Six Sigma Black Belt
Which Element of Waste best describes "the unnecessary movement of materials and goods"?
Range Charts are the technique used to determine if Special Causes are occurring within the subgroups of the ______________.
One of the primary deliverables from performing a SIPOC is to begin to understand which outputs have the greatest affect on the customer most valued inputs.
Questions that can be best answered by a Visual Factory include all of these except _____________________.
The Lean toolbox includes all of the following items except __________.
The Japanese born function of a Kanban event utilizes a specific, step-by-step approach meant to bring about major changes to a process.
A Belt working in a supply chain environment has to make a decision to change suppliers of critical raw materials for a new product upgrade. The purchasing manager is depending on the Belt’s effort requiring that the average cost of an internal critical raw material component be less than or equal to $4,200 in order to stay within budget. Using a sample of 35 first article components, a Mean of the new product upgrade price of $4,060, and a Standard Deviation of $98 was estimated. In order to increase the Long Term Z value to 4, what is the maximum long term variation in pricing the Belt can accept for his upgraded critical raw material component?
The primary objective in removal of waste is to improve the Order Production Cycle where the time from _________________ to the time of receipt of payment is compressed.
For a Kanban to be successful which of these must occur?
For the data set shown here which of these statements is/are true?