ASQ CSSBB - Certified Six Sigma Black Belt
As a means of measuring the effects on other areas of a process as a result of changes in the primary metric we also define and track ________________.
Two of the key deliverables for the Measure Phase are a robust description of the process and its flow and an assessment of the Management System.
Questions that can be best answered by a Visual Factory include all of these except _____________________.
Which statement(s) are correct about the Factorial Plot shown here? (Note: There are 3 correct answers).
The Japanese born function of a Kaizen event utilizes a specific, step-by-step approach meant to bring about major changes to a process.
One of the foundations of Lean Six Sigma is the concept that the output of a process (Y) is influenced by the process inputs (X’s) and is commonly shown as which formula?
An example of the waste of mismanaged Inventory is __________.
When a Belt conducts a Linear Correlation Analysis and finds that as an X increases the Y also increase then he has proven a ______________ correlation.
Which of these graphical presentations displays the values of each individual reading?
When a Belt Poka-Yoke’s a defect out of the process entirely then she should track the activity with a robust SPC system on the characteristic of interest in the defect as an early warning system.