Pre-Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

ASQ CSSBB - Certified Six Sigma Black Belt

Page: 6 / 9
Total 285 questions

Which of the following is the primary benefit of single-minute exchange of dies (SMED)?

A.

Increased flexibility

B.

Higher rolled throughput yield

C.

Fewer defects

D.

Fewer breakdowns

A cause and effect diagram is used primarily to

A.

divide causes into generic categories

B.

show the logical relationship between factors

C.

rank causes from most significant to least significant

D.

identify and evaluate potential failure modes in order to eliminate defects

Using the provided data, what is the calculated value?

A.

4.92

B.

5.37

C.

6.14

D.

6.89

The gains made as the result of an improvement process can best be maintained by taking which of the following actions?

A.

Aligning the project results with the organizational goals and objectives

B.

Adjusting budgets to reflect improvements from the project

C.

Modifying procedures to reflect the changes in the revised process

D.

Providing senior leaders with information about the implementation plan

Which of the following is an acceptable way to reduce the number of options in a solution selection matrix?

A.

Brainstorming

B.

Affinity diagramming

C.

Multivoting

D.

Process mapping

Which of the following tools is used to improve product development, order-processing, and production activities on an ongoing basis?

A.

Muri

B.

5S

C.

Kaizen

D.

Muda

Which of the following is an example of an effective goal statement in a project charter?

A.

Increase productivity levels from 5 to 7 units per hour on all shifts

B.

Reduce defects to 10% per lot

C.

Reduce cycle time for parts from 10 days to 1 day by fiscal year end

D.

Reduce cycle time for parts to 3 days in two months

Which of the following elements should be included with the documentation for a process failure mode and effects analysis (PFMEA)?

A.

Flowchart

B.

Stem-and-leaf plot

C.

Quality function deployment (QFD)

D.

Hoshin planning

Which of the following elements should a team include in the control plan for a revised process?

A.

A reaction plan

B.

A cause and effect matrix

C.

Potential improvement opportunities

D.

Projected financial results

A company’s final assembly area is often in confusion and disorder because containers of subassemblies are sent directly to final assembly as they are completed in other production areas. Which of the following methods is designed to address this type of problem?

A.

Standard work

B.

5S

C.

Poka-yoke

D.

kanban