Which of the following sources of information is useful in facilitating interactions on a project team?

A.

Meeting minutes

B.

Routine status report

C.

A communication plan

D.

Team leader feedback

Which of the following factors is a consideration in design for maintainability?

A.

Frequency of scheduled servicing

B.

Product failure modes

C.

Variability of process inputs

D.

Number of customer complaints

After a project team completes a gap analysis, the next step is to

A.

develop improvement goals

B.

communicate the results to management

C.

revise the project’s operational goals

D.

create a value stream map

The purpose of the correlation matrix on the roof of a house of quality is to

A.

resolve conflicting requirements from multiple customers

B.

show what each customer expects from the products

C.

show how quality tools are used in the organization

D.

identify the interrelationships of design features

A Six Sigma team is reviewing the following data from a 2-sample t-test on Unit 1 and Unit 2 of a product. Variances are not assumed to be equal.

On the basis of this information below, which of the following conclusions would be appropriate to draw from this test?

A.

Fail to reject the null hypothesis that the means are equal

B.

Fail to reject the null hypothesis that the variances are equal

C.

Reject the null hypothesis that the means are equal

D.

Reject the null hypothesis that the variances are equal

Which of the following actions will support design for manufacturability (DFM)?

A.

Ensuring that product tolerances are reasonable

B.

Ensuring that all KPOVs are addressed

C.

Determining test measurement uncertainty

D.

Determining takt time

Which of the following tools can be used to break down the tasks for implementing a strategic objective?

A.

Affinity diagram

B.

Interrelationship digraph

C.

Tree diagram

D.

Pareto chart

Which of the following tools is a project management technique designed to determine communication protocols and level of involvement for key personnel when decisions are being made?

A.

Toll-gate

B.

Activity network diagram

C.

Project charter review

D.

RACI

When a team is performing an analysis of variance (ANOVA), which of the following conditions would indicate the need to transform the data?

A.

There is evidence of outliers in the raw data.

B.

The residuals indicate a non-constant variance.

C.

The residuals show patterns of completely random behavior.

D.

A normal probability plot of residuals exhibits a completely linear relationship.

Which of the following is the best tool to use to identify the specific tasks needed to complete a project?

A.

PERT

B.

Activity network diagram

C.

Work breakdown structure

D.

Critical path method