Pre-Summer Sale Special Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

ASQ CSSBB - Certified Six Sigma Black Belt

Page: 8 / 9
Total 285 questions

A Black Belt tells a project team, “For our control charts, we need samples that are as homogeneous as possible and that allow the maximum opportunity for variation between them.” The Black Belt is describing

A.

a critical parameter

B.

rational subgrouping

C.

inspection sampling

D.

randomness

A patient arrives at the clinic at noon and was called into an exam room at 12:43 pm by a nurse for a blood draw. The blood draw tubes were not available in the exam room, so the nurse went to the clinic supply room and found that no blood draw tubes were left. In addition to waiting, which of the following forms of waste were present?

A.

Inventory

B.

Overproduction

C.

Motion

D.

bottleneck

As a Black Belt project team leader, which of the following tools would keep team meetings focused and on schedule?

A.

Publish an agenda

B.

Flip chart

C.

Project charter

D.

Brainstorming session

The engineering specification for a new circular part is 25 mm ± 1 mm. The distribution of part measurements is assumed to be normal, with 99.73% of the parts meeting the specification. For a sample size of 36, what process control limits should be used for the sample means?

A.

25 ± 0.028

B.

25 ± 0.167

C.

36 ± 0.028

D.

36 ± 0.167

After completion of the control phase, an improved process must continue to be monitored for which of the following reasons?

A.

One or more of the constraints might move.

B.

The process owner needs time to learn the new process.

C.

It is less costly to improve the process a second time using the same resources.

D.

The next pilot run will address a new constraint.

There has been an increase in the measurement of hazardous materials being detected at a transportation terminus over the last 3 months. The terminus is located in an area that has been unusually rainy during the same period. Which of the following tools should be used to determine whether there is a relationship between the chemical hazards and the rainfall?

A.

Simple linear regression

B.

Fishbone diagram

C.

Failure mode and effects analysis

D.

Repeatability and reproducibility study

Which of the following levels of the work breakdown structure (WBS) includes an explanation of the purpose of the project?

A.

Project

B.

Phase

C.

Activity

D.

Task

A cause that contributes to excessive variation and is detectable using a control chart is referred to as

A.

common

B.

rational

C.

systematic

D.

assignable

Which of the following measurement scales classifies data into categories with no implied order?

A.

Interval

B.

Ordinal

C.

Ratio

D.

Nominal

On a Six Sigma team, which of the following members should take the lead in helping to resolve team conflict?

A.

Champion

B.

Sponsor

C.

Green Belt

D.

Facilitator