ASQ CSSBB - Certified Six Sigma Black Belt
A Black Belt tells a project team, “For our control charts, we need samples that are as homogeneous as possible and that allow the maximum opportunity for variation between them.†The Black Belt is describing
A patient arrives at the clinic at noon and was called into an exam room at 12:43 pm by a nurse for a blood draw. The blood draw tubes were not available in the exam room, so the nurse went to the clinic supply room and found that no blood draw tubes were left. In addition to waiting, which of the following forms of waste were present?
As a Black Belt project team leader, which of the following tools would keep team meetings focused and on schedule?
The engineering specification for a new circular part is 25 mm ± 1 mm. The distribution of part measurements is assumed to be normal, with 99.73% of the parts meeting the specification. For a sample size of 36, what process control limits should be used for the sample means?
After completion of the control phase, an improved process must continue to be monitored for which of the following reasons?
There has been an increase in the measurement of hazardous materials being detected at a transportation terminus over the last 3 months. The terminus is located in an area that has been unusually rainy during the same period. Which of the following tools should be used to determine whether there is a relationship between the chemical hazards and the rainfall?
Which of the following levels of the work breakdown structure (WBS) includes an explanation of the purpose of the project?
A cause that contributes to excessive variation and is detectable using a control chart is referred to as
Which of the following measurement scales classifies data into categories with no implied order?
On a Six Sigma team, which of the following members should take the lead in helping to resolve team conflict?