Halloween Sale Special - 75% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: newyear

iSQI CTAL-TAE_V2 - ISTQB Certified Tester Advanced Level - Test Automation Engineering CTAL-TAE (Syllabus v2.0)

Page: 3 / 3
Total 80 questions

Which of the following statements about the relationship between TAA, TAS and TAF is true?

A.

A TAF can be used to implement a TAS, which is an implementation of a TAA

B.

A TAS can be used to implement a TAF, which is an implementation of a TAA

C.

A TAS can be used to implement a TAA, which is an implementation of a TAF

D.

A TAF can be used to implement a TAA, which is an implementation of a TAS

Which ONE of the four layers of the test automation architecture provides an optional capability?

A.

Test execution layer

B.

Test adaptation layer

C.

Test definition layer

D.

Test generation layer

Which items should be included in a report that is produced after execution of a test suite?

A.

Test results and a list of operational stakeholders

B.

Test environment details and root causes of defects found

C.

SUT information and TAS configuration details

D.

Test results and test environment details

Automated tests run by a TAS on a SUT can be subject to sudden bursts of messages to log during their execution. All log messages that occur during execution must be permanently stored in the corresponding test execution logs by the TAS for later analysis. If logging is not performed correctly, these bursts can reduce the execution speed of these automated tests, causing them to produce unreliable results. Which of the following solutions would you expect to be MOST useful to address this issue for TAS logging?

A.

Use a Network Time Protocol (NTP) server to ensure that the clocks of the machines running TAS and SUT are synchronized with a common time source

B.

Log all the messages in memory using a circular buffer and periodically flush the buffer to the corresponding log files associated with the specific execution

C.

Avoid logging the messages that occur during the specified bursts to minimize any potential performance overhead in test execution

D.

Log all the messages directly on the corresponding log files associated with the specific execution to ensure the permanent storage of test execution logs