Winter Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

ISTQB CTAL-TM - Certified Tester Advanced Level Test Management (CTAL-TM) v3.0

Page: 2 / 7
Total 228 questions

Which of the following Is a way in which risk analysis drives test analysis?

A.

It determines which tests should be executed first

B.

It guides the selection of test conditions that must be covered by testing

C.

It influences the type of reporting that will be used during execution

D.

it drives root cause analysis for any defects found

What occurs In the retrospective closing?

A.

Everyone shakes hands

B.

The data collection methods are reviewed

C.

The strengths and opportunities for improvement in the retrospectives are discussed

D.

A brainstorming session is held to discuss the solutions to the root causes of the most significant issues

Your team has been working on an Agile project for two months. There is a retrospective at the endof each sprint One of the data items reviewed is how many defects are being caught by users rather than by testers. The test team is being blamed for these escapes

What do you need to do to make these sessions more productive?

A.

You should attend the retrospective instead of the individual testers

B.

You should do root cause analysis to prove the developers are responsible

C.

You should gather metrics to present to the team regarding all the hours spent testing

D.

You should help the team brainstorm ideas on how to improve the testing to eliminate the escapes

You are managing the testing for a bank card project. The testing was scheduled to take 10 weeks but by the time the software was developed only six weeks were available for testing Knowing there were a lot of risks with the software your team started testing activities early by overseeing code reviews, defining acceptance criteria by working with the users and by doing all lest creation prior to the code arriving

You are now three days away from the go-live date Your testing has mitigated all the high and medium risk items leaving only the low-risk elements unmitigated by testing You estimate it will take two weeks to manually test the low-risk elements At this point what should you do?

A.

Automate the testing of the untested elements to ensure they are covered

B.

Block the go-live and start testing the low-risk elements immediately

C.

Transfer the risk of the untested low-risk items to the help desk

D.

Select one of the low-risk elements and perform depth testing to assess the residual risk

If you are monitoring code coverage during testing to determine what areas still need testing what type of testing is likely occurring?

A.

Black-box

B.

White-box

C.

Functional

D.

Non-functional

One of your team members is struggling to identify the requirements to be tested for a project The requirements documents are not conventional but you have determined that the data is there. If they do some digging to find it Given this information in what competence area does this person need to improve?

A.

Professional competence

B.

Methodical competence

C.

Social competence

D.

Personal competence

Your organization has decided to augment your testing team with an offshore team. The offshore team members are experienced testers who are experts in the domain of the system under test Your team is worried about the offshore team taking their jobs and they are resistant to the change You need to pick three of your team members to be the ambassadors for the new team

Which competences will be most important for your ambassadors to possess?

A.

Professional competence and methodological competence

B.

Methodological competence and social competence

C.

Social competence and personal competence

D.

Personal competence and professional competence

Your team has been assigned to a new project You have a mix of manual testers and automation engineers but everyone is currently doing manual testing. The development learn has alreadydecided to use DevOps as its approach but they have never used it before and are happy to take your input Unfortunately, about 50% of the development is completed already In the testing your team is doing they are finding that about 40% of the defects they catch are actually regressions caused by other changes

Given this information what should you do to help mitigate risk'?

A.

Review the policies regarding defect reporting and ensure your team is adding all the necessary information to each defect report

B.

Pivot part of the team from manual testing to test automation development to address the regression risk and implement better quality gates to reduce regressions

C.

Optimize the test environment to provide faster testing with more accurate test data and better testing tools to provide wider coverage

D.

Implement code reviews for the development team and require tester signoff before code can be released into the pipeline

Which of the following is required to apply an experience-based testing approach''

A.

Detailed requirements

B.

Usage models

C.

Tester knowledge of the system and its usage

D.

A full risk-assessment to support risk prioritization

Your manager has decided that your team of manual testers should all become test automation engineers Your team is much stronger in analysis than In technical testing so you are concerned about their ability to adapt. What tool capabilities could help with this transition?

A.

Low license costs

B.

Remote storage of the test automation scripts

C.

High usability with Al-assisted object capture

D.

Good reporting