Summer Sale Limited Time 65% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: ecus65

iSQI CTFL-001 - ISTQB Certified Tester Foundation Level

Page: 4 / 6
Total 338 questions

Based on the information given in the scenario, identify how the team could be improved most effectively? 2 credits

A.

By providing training in the payroll domain

B.

By providing a workshop on test design techniques

C.

By providing specific training on the systems being tested

D.

By providing training on reviewing requirements

A number of options have been suggested for the level of independence to be employed for the testing on the next project, and are shown below.

i. External test specialists perform non-functional testing.

ii. Testing is outsourced.

iii. Testing is carried out by the developer.

iv. A separate test team carries out the testing.

v. Testing is performed by the business.

vi. Testing is performed by a different developer.

Which of the following orders the above in a correct order of independence? 1 credit

A.

i, ii, iv, vi

B.

ii, i, v, vi

C.

ii, v, i, iii

D.

i, iv, v, vi

Which of the following is a benefit of independent testing? 1 credit

A.

Code cannot be released into production until independent testing is complete.

B.

Testing is isolated from development.

C.

Independent testers find different defects and are unbiased.

D.

Developers do not have to take as much responsibility for quality.

Which of the following is a valid drawback of independent testing? 1 credit

A.

Developer and independent testing will overlap and waste resources.

B.

Developers loose the sense of responsibility and independent testers may become a bottleneck.

C.

Independent testers need extra education and always cost more.

D.

Independent testers will become a bottleneck and introduce problems in incident management.

The test improvement project will take place in an organization developing a safety-critical avionics application. Which one of the following standards do you believe would be most appropriate to take into account for compliance during your assignment? 1 credit

A.

ISO 9126

B.

IEEE 829

C.

BS 7925/2

D.

DO-178B

Which one of the following estimation approaches is appropriate at this stage of the project? 2 credits

A.

Create an estimate based on the function point analysis technique and test point analysis

B.

Create an estimate based on the complexity of the code

C.

Create an estimate based on the credentials of the successful bidder

D.

Create an estimate based on a percentage of the development effort

What would be a test approach regarding the test design techniques to be applied that would fit an item with the highest risk? 2 credits

A.

Component testing: decision testing; System testing: exploratory testing

B.

Component testing: decision testing; System testing: decision table testing

C.

Component testing: statement testing; System testing: equivalence partitioning

D.

Component testing: statement testing; System testing: decision table partitioning

What is the Risk Priority Number for risk item number 2? 2 credits

A.

16

B.

2

C.

1

D.

63

Which of the following characteristics of good testing apply to any software development life cycle model?

A.

Acceptance testing is always the final test level to be applied.

B.

All test levels are planned and completed for each developed feature.

C.

Testers are involved as soon as the first piece of code can be executed.

D.

For every development activity there is a corresponding testing activity.

Which of the following, if observed in reviews and tests, would lead to problems (or conflict) within teams?

A.

Testers and reviewers are not curious enough to find defects.

B.

Testers and reviewers are not qualified enough to find failures and faults.

C.

Testers and reviewers communicate defects as criticism against persons and not against the software product.

D.

Testers and reviewers expect that defects in the software product have already been found and fixed by the developers.