Milestones are key events or deliverables in a project. On a Gantt Chart or Network Diagram, milestones are represented by a(n)

A.

circle or oval.

B.

diamond or triangle.

C.

square or rectangle.

D.

asterisk or apostrophe.

Network Quality of Service (QoS) is defined as

A.

the ability to prioritize the traffic in the network system.

B.

the ability to set the quantity of stations connected via the network.

C.

the ability to remotely manage network switches, routers and hubs via the network connection.

D.

a feature allowing the network administrator to monitor who is connected to the network at any given time.

A loudspeaker with sensitivity 90 dB SPL measured at 1 meter, 1 watt Is placed 2 meters away from a listener. At 1 watt, what Is the SPL at the listener?

A.

81 dB SPL

B.

84 dB SPL

C.

87 dB SPL

D.

90 dB SPL

In order to estimate project task duration, one needs to understand the effort required to complete the expected scope and:

A.

Client budget

B.

User experience

C.

Required training

D.

Resource availability

When considering the security of AV equipment residing on the client network, what is the MOST important step to take to keep the equipment safe from hackers before connecting the equipment to the network?

A.

assign an isolated subnet

B.

change the default passwords

C.

lock out the front panel buttons

D.

mount the equipment to the rack with security screws

According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?

A.

Week 3

B.

Week 4

C.

Activity B

D.

Milestone X

When specifying a paging system for a large building, what kind of speaker system should be recommended?

A.

near field

B.

line array

C.

direct coupled

D.

constant voltage

Which is the MOST important factor during the development of an AV project scope?

A.

entire budget

B.

clients responsibility

C.

analyze the strategic plan

D.

stakeholders requirements

The MOST important information to come away with from an initial site survey is the

A.

key decision maker.

B.

final budget for the entire project.

C.

overall scope AV solution needed.

D.

manufacturers which will be used in the AV system.

When choosing an amplifier for a 70 V system, what amplifier output would be the BEST option for a space with 12 speakers, each tapped to 30 W?

A.

1 channel, 500 W at 70 V

B.

2 channel, 200 W at 70 V

C.

12 channel, 30 W at 70 V

D.

12 channel, 30 W at 8 Ω