AVIXA CTS - Certified Technology Specialist
Milestones are key events or deliverables in a project. On a Gantt Chart or Network Diagram, milestones are represented by a(n)
Network Quality of Service (QoS) is defined as
A loudspeaker with sensitivity 90 dB SPL measured at 1 meter, 1 watt Is placed 2 meters away from a listener. At 1 watt, what Is the SPL at the listener?
In order to estimate project task duration, one needs to understand the effort required to complete the expected scope and:
When considering the security of AV equipment residing on the client network, what is the MOST important step to take to keep the equipment safe from hackers before connecting the equipment to the network?
According to the Gantt chart pictured, the Project Manager should wait to start Activity C until which predecessor has been reached?
When specifying a paging system for a large building, what kind of speaker system should be recommended?
Which is the MOST important factor during the development of an AV project scope?
The MOST important information to come away with from an initial site survey is the
When choosing an amplifier for a 70 V system, what amplifier output would be the BEST option for a space with 12 speakers, each tapped to 30 W?