What is the standard impedance of a DMX cable?

A.

55 Q

B.

75 Q

C.

110 Q

D.

150 Q

What is the PRIMARY advantage of preventive maintenance?

A.

upfront costs

B.

system fail proof

C.

less equipment downtime

D.

better system performance

Two computers are connected to a videoconferencing system through a switcher using HDMI cables. Computer content from PC A is being properly transmitted. However, when PC B is selected by the switcher, it does not work through the videoconferencing system. They both work when connected directly to the videoconferencing system or the monitor. The solution is to add a device that enables____management.

A.

DDC

B.

DHCP

C.

HDCP

D.

TMDS

During the installation of an audiovisual system, a client states that they wish to add a videoconferencing system that was not considered in the initial scope of the project. What form is required?

A.

Request for Quotes (RFQ)

B.

Request for Change (RFC)

C.

Request for Proposals (RFP)

D.

Request for Information (RFI)

After installation, the system does not pass audio. Based on the information in the drawing, what is the MOST LIKELY cause?

A.

cable lengths

B.

system needs a DSP

C.

phantom power is required

D.

speaker requires a 70 V transformer

When a presenter is using a headworn wireless microphone, the sound technician notices a great deal of plosives and breath noise. To correct this problem, the technician should:

A.

Ask the speaker to talk more quietly

B.

Adjust the microphone wireless transmitter gain

C.

Change from an omnidirectional to a cardioid capsule

D.

Adjust the position of the microphone and use a windscreen

A change order (variation) is best defined as a:

A.

Change to the technician’s salary

B.

Price change to a vendor purchase order

C.

Drawing change to document CAD details

D.

Change to the scope of an awarded project

Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is

A.

training the client.

B.

testing and verification.

C.

invoicing and project close out.

D.

preventative maintenance schedule.

A client wants to replace an older projector with a flat-panel 240 in (610 cm) diagonal display. The client has complained about the cost of replacement lamps for the existing projector as the reason for switching to a flat-panel display. Which of the following is the BEST alternative for a successful solution?

A.

LCD display

B.

Laser projector

C.

Direct view LED

D.

Custom-built OLED display

Image:

Based on this diagram, how many lighting zones are there?

A.

3

B.

4

C.

5

D.

6