Your project uses process orders for the production of liquid chemicals. What can you define to ensure that production flow only happens in suitable physically connected tanks? Note: There are 2 correct answers to this question.

A.

Resource hierarchy

B.

Resource selection

C.

Resource matrix

D.

Resource network

What could be the reason for multiple commitments where several operations have the same scheduled dates on a work center after dispatching? Note: There are 2 correct answers to this question.

A.

The Finite Scheduling indicator is NOT set in the strategy profile.

B.

The work center has several individual capacities.

C.

Alternative work centers are fully occupied.

D.

The Change Planning Direction indicator is set in the strategy profile.

How can you set up a material as a phantom assembly? Note: There are 2 correct answers to this question.

A.

Select a special procurement type inside the material master.

B.

Use a special item category in your material BOM (bill of material).

C.

Select a special MRP type inside the material master.

D.

Define the special procurement type inside the material BOM (bill of material).

For a production version to be valid and consistent, what requirements must be fulfilled? Note: There are 3 correct answers to this question.

A.

The deletion flag must NOT be set for the bill of material (BOM) or the routing.

B.

The consistency check must be performed.

C.

The assigned routing and bill of material (BOM) must be valid in the entire validity period.

D.

The assigned routing and bill of material (BOM) must have the same validity period.

E.

The lot size range must be within the lot size range of the assigned routing.

What does the material type influence? Note: There are 2 correct answers to this question.

A.

Which document types and class categories are allowed

B.

Which plant-specific and plant-independent statuses are allowed

C.

Which material master screens appear and in which sequence

D.

Whether the material is produced in-house, procured externally, or both

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks? Note: There are 2 correct answers to this question.

A.

Use batch determination.

B.

Use the Batch Information Cockpit.

C.

Use the batch where-used list.

D.

Use batch derivation.

Which actions does the system perform by default when you save a confirmation for a finished product in repetitive manufacturing? Note: There are 3 correct answers to this question.

A.

Post the goods receipt for the finished product.

B.

Reduce run schedule quantities.

C.

Post production costs to the planned order.

D.

Update statistics for the Business Information Warehouse.

E.

Create associated capacity requirements.

You are a consultant on an SAP S/4HANA Cloud Greenfield project. Which of the following aspects should you focus on to achieve and maintain clean core data quality? Note: There are 2 correct answers to this question.

A.

Efficiency

B.

Accuracy

C.

Timeliness

D.

Stability

You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements by dependent requirements for the semi-finished material?

A.

Assembly processing with production orders (82)

B.

Planning with final assembly (40)

C.

Production by lot size (30)

D.

Planning at assembly level (70)

Your company manufactures materials whose characteristics differ for each manufacturing process. Which application do you have to use in SAP S/4HANA Cloud Private Edition to be able to track and use this information in all areas of logistics?

A.

Process order management

B.

Engineering change management

C.

Quality management

D.

Batch management