SAP C_TS422_2023 - SAP Certified Associate - SAP S/4HANA Cloud Private Edition, Production Planning and Manufacturing

Page: 3 / 3
Total 80 questions

Which alternative item strategies are available in bills of material (BOMs) in SAP S/4HANA Cloud Private Edition? Note: There are 2 correct answers to this question.

A.

First in first out (FIFO)

B.

Simultaneous

C.

Manual maintenance

D.

100% check

You have maintained the parameters for simple discontinuation in the material master of a component. Which business process will be affected if the available stock is zero and the discontinuation date is in the past?

A.

Backflushing

B.

Kanban

C.

Material requirements planning

D.

Production order release

Which time elements does MRP consider in backward scheduling to determine the basic dates for components from dependent requirements? Note: There are 2 correct answers to this question.

A.

Planned delivery time

B.

Total replenishment lead time

C.

Operation duration

D.

In-house production time

You are trying to create a production order, but NO valid production version can be selected. What could be the reasons? Note: There are 2 correct answers to this question.

A.

The order lot size is NOT within the validity range of a production version.

B.

NO production lines are assigned to the production versions.

C.

All production versions for the material are locked.

D.

NO bills of material (BOMs) are assigned to the production versions.