Which default values can you configure for the product cost collector? Note: There are 2 correct answers to this question.

A.

Result Analysis (RA) Version

B.

Result Analysis (RA) key

C.

Costing variant for preliminary costing

D.

Variance variant

You are setting up a direct internal activity allocation in SAP S4/HANA. What is valid receivers for the activity? Note: There are 3 correct answers to this question.

A.

Profit center

B.

WBS element

C.

Sales order item

D.

Internal order

E.

General ledger account

You have implemented Product Cost by Sales Oder in conjunction with revenue-based results analysis in your organization.

For a particular sales order item, you have the following:

Plan revenue = 3000; Plan costs = 2000

Actual revenue = 1200; Actual costs = 1000

What data does the system calculate during results analysis?

A.

Revenue = 1200; Cost of sales = 800; Reserve = 200

B.

Revenue = 1200; Cost of sales = 1000; Reserve = 200

C.

Revenue = 1200; Cost of sales = 1000; WIP = 200

D.

Revenue = 1200; Cost of sales = 800; WIP = 200

You want to understand why cost are collected on sales order item level. What do you need to in the configuration? Note: There are 3 correct answers to this question.

A.

Requirement type

B.

Requirements class

C.

Valuation variant

D.

Costing type

E.

Account assignment category

Which of the following values can be calculated using result analysis? Note: There are 3 correct answers to this question.

A.

Cost of sales

B.

Reserves for unrealized costs

C.

Cost of goods manufactured

D.

Gross margin

E.

Work in progress

You create alternative CO versions for your controlling area, in addition to version 0. What would you use additional CO versions for? Note: There are 2 correct answers to this question.

A.

To store data of alternative plan costing runs

B.

To store different plan data

C.

To store data of parallel valuation

D.

To store different budget data

You would like to allocate primary and secondary costs from a cost center to another cost center. Which allocation method will you use?

A.

Assessment

B.

Distribution

C.

Periodic reposting

D.

Direct activity allocation

You use a production order with Product Cost by Period and you entered a results analysis key and variance key. How does the system calculate variances in Product Cost by Period?

A.

Variances = Target costs - Delivery value

B.

Variances = Target costs - Delivery value - WIP

C.

Variances = Actual costs - Delivery value - WIP

D.

Variances = Actual costs - Delivery value

What values flow from Sales and Distribution billing to costing-based Profitability Analysis? Note: There are 2 correct answers to this question.

A.

Cost of goods sold split by cost components

B.

Value of "Gross Margin 2"

C.

Production variances split by variance categories

D.

Value of conditions of pricing procedure

You want to determine which operations of the routing should be considered in a product cost calculation. How do you do this? Note: There are 2 correct answers to this question.

A.

By marking the cost indicator in the control key assigned to the operation

B.

By marking the Relevance to Costing indicator in the operation

C.

By assigning a cost center to the work center in the operation

D.

By defining a usage key in the header of the routing.