Your customer is redesigning their network layout to a leaf-spine architecture. For the top of this three, they want switches that are able to provide at least 28x 10 Gbps optical ports.
Which switch should you recommend?
Which device can supply power to cameras and other low-power devices over a network cable?
A customer database workload requires 125 drives. They have a SAN with DB610S switches. At the second site, for synchronous mirroring they will use a DE6000H system.
Which Lenovo storage system will meet this customer’s needs at the local site?
Your customer just purchased 20 Lenovo ThinkSystem SR650 servers. They plan to manage all of them with Lenovo XClarity Administrator, and they need only 1 Gb connectivity. You decide to offer a switch to connect all the XClarity Controller interfaces to one switch.
Which switch should you recommend?
Your customer is looking for a unified storage solution with the highest performance and lowest latency with the capability of storing cold data to cloud.
Which Lenovo Storage solution should you recommend?
A customer is planning a new environment for big data analytics. Each node uses an SR550 server with 12 internal drives. There is a requirement for each server to have access to an additional 20 direct attached drives.
Which Lenovo Storage system meets their needs?
A customer needs fibre channel (FC) connectivity for remote offices. Up to 20 FC devices may be connected. No redundancy is required.
Which Lenovo FC offering should you recommend?
A customer needs shared block storage for an application. They also want to move their Windows and Linux shared drives onto a storage system. The space required will not exceed 900 TB, and they do not have a storage-intensive workload. Price is an important concern.
Which storage system meets their needs?
What are three reasons to move to a public cloud? (Choose three.)
What is keyquestionto ask your customer when determining which category of Lenovo Support Services is the best fit for their data center?