Huawei H19-424_V1.0 - HCSP-Presales-Campus Network Planning and Design V1.0
When using the planning and design tool, the files that cannot be output at the moment are
In the V200R022 version of the S switch, the description of the S5X31(S)-S multi-rate switch is wrong ()
The description of the channel configuration template for the configuration generation tool scenario is correct
When using the planning and design tool, adjust the board position of the service board in the modular switch on which page of the tool ()
Regarding end.dt4, decapsulation and specific IPV4 lookup tables, the statement is wrong ()
In the V1R22C00 version of CloudCampus solution, the description of the FW synchronization IP-Group feature is incorrect ()
The description of the intelligent routing strategy of the LAN &WAN convergence solution is incorrect
For the sake of WLAN security, if the customer wants to manage the WLAN data in a unified manner, the customer can choose which of the following networking methods:
Regarding the description of tunnel planning, it is incorrect ()
When using the planning and design tool, which of the following statements about the logical networking of the campus network is incorrect?