Weekend Sale Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: xmas50

Huawei H35-561 - HCNP - LTE RNP & RNO

Page: 2 / 2
Total 60 questions

A CCE (control channel element, control channel element) is composed of several REG (resource element group, resource particle group)?

A.

6

B.

7

C.

8

D.

9

What are the types of switching according to the trigger reason? (multiple choice)

A.

Overlay-based handover

B.

Load-based handover

C.

Business-based handover

D.

Handover based on UE moving speed

Which of the following control signalings for uplink PUCCH feedback? (multiple choice)

A.

PMI

B.

cQI

C.

RI

D.

Qos

Which of the following methods can be used to solve the cross-area coverage problem? (multiple choice)

A.

Appropriately reduce the transmit power of the cross-area cell

B.

Adjust the uplink power control parameter factory of the cross-zone cell

C.

Adjust the downlink scheduling mode of the cross-area cell

D.

Adjust the antenna parameters of the cross-area cell (height, inclination, azimuth, etc.)

Which of the following scenarios should use the RIM process? (multiple choice)

A.

Flash CSFB

B.

PS CSFB

C.

CCO/NACC

D.

PS handover

In handover based on frequency priority, event A1 is used to stop inter-frequency measurement.

A.

True

B.

False

Regarding the demodulation reference signal, which of the following statements are correct? (multiple choice)

A.

Related to PUSCH

B.

Nothing to do with PUSCH

C.

Related to PUCCH

D.

Nothing to do with PUCCH

In the LTE system, which of the following criteria is used for cell selection?

A.

Srxley >0

B.

Squal >0

C.

Srxlev> 0, and Squal> 0

D.

Srxlev >0 or Squal >0