IASSC ICBB - IASSC Lean Six Sigma – Black Belt
A Non-parametric Test should be used if just one distribution is not Normal out of the two or more gathered.
The Waste of Overproduction is defined as ______________________.
Which statement(s) are correct about the Regression shown here? (Note: There are 2 correct answers).

The English words used for the 5S’s are __________ , _____________ , Shining, Standardizing and Sustaining. (Note: There are 2 correct answers).
Early in a project a Belt will want to begin to identify and evaluate risk factors for the subject process and will therefore begin building a(n) ______________.
Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _________ before anything moves.
The Control Limits width varies if the sample size varies for which type of chart?
In a good Measurement System the most variation will be with part-to-part measurements. What should you do if the majority of variation is associated with the Gage R&R assuming the gage is technically capable?
Fractional Factorial Designs are used to analyze factors to model the output as a function of inputs if Hypothesis Testing in the Analyze Phase was inadequate to sufficiently narrow the factors that significantly impact the output(s).
Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.