A Non-parametric Test should be used if just one distribution is not Normal out of the two or more gathered.

A.

True

B.

False

The Waste of Overproduction is defined as ______________________.

A.

The unnecessary movement of people and equipment

B.

The liability of materials that are bought, invested in and not immediately sold or used

C.

Producing more than the next step needs or more than the customer buys

D.

The extra movement of material

Which statement(s) are correct about the Regression shown here? (Note: There are 2 correct answers).

A.

The dependent variable is the outside temperature

B.

The relationship between outside temperature and number of customers per hour is a Linear Regression

C.

The dashed lines indicate with 95% confidence where all of the process data should fall between

D.

The dashed lines indicate with 95% confidence the estimate for the Quadratic Regression Line

E.

The predicted number of customers per hour is close to 5 if the outside temperature is 10 deg C

The English words used for the 5S’s are __________ , _____________ , Shining, Standardizing and Sustaining. (Note: There are 2 correct answers).

A.

Shaping

B.

Sorting

C.

Shifting

D.

Straightening

Early in a project a Belt will want to begin to identify and evaluate risk factors for the subject process and will therefore begin building a(n) ______________.

A.

SIPOC

B.

FMEA

C.

Business Case

D.

Team charter

Kanban establishes a means of monitoring production, conveyance and delivery information such that efficient flow is established. The method used by Kanban is to require a _________ before anything moves.

A.

Sign-off

B.

Signal

C.

Bell to ring

D.

Work order

The Control Limits width varies if the sample size varies for which type of chart?

A.

P Charts

B.

NP Charts

C.

Xbar-R Charts

D.

Time Series Charts

In a good Measurement System the most variation will be with part-to-part measurements. What should you do if the majority of variation is associated with the Gage R&R assuming the gage is technically capable?

A.

Focus on fixing the Repeatability and Reproducibility of the measurement device

B.

Purchase a new machine

C.

Focus on trimming the Part-to-Part variation

D.

Run another MSA test with the machine

Fractional Factorial Designs are used to analyze factors to model the output as a function of inputs if Hypothesis Testing in the Analyze Phase was inadequate to sufficiently narrow the factors that significantly impact the output(s).

A.

True

B.

False

Following the completion of a LSS project the Belt not only creates a Control Plan he also develops a _____________ so those involved in the process know what to do when the critical metrics move out of spec.

A.

Response Plan

B.

Call List

C.

Chain-of-Command

D.

Defect Analysis Plan